Assessment Year | 2014 |
---|---|
Principal Product | Carbon Brakes |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
55,000
ft2
|
Annual Production | 31,555
pieces
|
Production Hrs. Annual | 4,290
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,272,045 | 15,532,046 |
kWh
|
$0.082 |
Electricity Demand | $479,317 | 34,593 |
kW-mo/yr
|
$13.86 |
Electricity Fees | $107,779 | - |
|
- |
Natural Gas | $894,900 | 158,372 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $518,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,890 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $360,753 | $1,272,000 |
$504,180
6,156,043
kWh
|
$124,740
-
kW-mo/yr
|
$(-145,046.0)
-
MMBtu
|
$(-123,121.0) | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $67,610 | $30,440 |
$62,216
759,661
kWh
|
$23,700
-
kW-mo/yr
|
$(-18,306.0)
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,591 | $59,600 |
$40,294
491,978
kWh
|
$5,297
-
kW-mo/yr
|
- | - | |
04 | 2.2422: Use waste heat from hot flue gases to generate steam | $28,012 | $38,000 | - | - |
$28,012
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,299 | $21,315 |
$12,512
152,768
kWh
|
$1,787
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,525 | $2,865 |
$2,041
24,926
kWh
|
$484
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $518,790 | $1,424,220 |
$621,243
7,585,376
kWh
|
$156,008
-
kW-mo/yr
|
$(-135,340.0)
-
MMBtu
|
$(-123,121.0) | ||
TOTAL IMPLEMENTED | $59,890 | $80,915 |
$52,806
644,746
kWh
|
$7,084
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs