ITAC Assessment: SD0479
ITAC logo
ITAC Assessment: SD0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Carbon Brakes
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 55,000
ft2
Annual Production 31,555
pieces
Production Hrs. Annual 4,290
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,272,045 15,532,046
kWh
Electricity Demand $479,317 34,593
kW-mo/yr
Electricity Fees $107,779 -
Natural Gas $894,900 158,372
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $518,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $360,753 $1,272,000 $504,180
6,156,043
kWh
$124,740
-
kW-mo/yr
$(-145,046.0)
-
MMBtu
$(-123,121.0)
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $67,610 $30,440 $62,216
759,661
kWh
$23,700
-
kW-mo/yr
$(-18,306.0)
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,591 $59,600 $40,294
491,978
kWh
$5,297
-
kW-mo/yr
- -
04 2.2422: Use waste heat from hot flue gases to generate steam $28,012 $38,000 - - $28,012
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,299 $21,315 $12,512
152,768
kWh
$1,787
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,525 $2,865 $2,041
24,926
kWh
$484
-
kW-mo/yr
- -
TOTAL RECOMMENDED $518,790 $1,424,220 $621,243
7,585,376
kWh
$156,008
-
kW-mo/yr
$(-135,340.0)
-
MMBtu
$(-123,121.0)
TOTAL IMPLEMENTED $59,890 $80,915 $52,806
644,746
kWh
$7,084
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs