Assessment Year | 1998 |
---|---|
Principal Product | Inner and Box Spring Components |
NAICS |
n/a
|
SIC | 3495: Wire Springs |
Sales Range | $5 M to 10M |
# of Employees | 140 |
Plant Area |
130,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,179 | 1,928,781 |
kWh
|
$0.023 |
Electricity Demand | $38,439 | 4,741 |
kW-mo/yr
|
$8.11 |
Electricity Fees | $6,650 | - |
|
- |
Natural Gas | $35,671 | 8,444 |
MMBtu
|
$4.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $192,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,704 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.441: Install automatic packing equipment | $182,000 | $200,000 | - | - | - | $182,000 | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $3,225 | $500 | - |
$3,225
-
MMBtu
|
- | - | - | |
03 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $2,932 | $6,000 | - |
$2,932
-
MMBtu
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $2,172 | $6,200 |
$(-380.0)
(-15,826)
kWh
|
$2,552
-
MMBtu
|
- | - | - | |
05 | 2.7261: Install timers and/or thermostats | $1,094 | $800 | - |
$1,094
-
MMBtu
|
- | - | - | |
06 | 3.4151: Minimize water usage | $400 | $1,875 |
$(-78.0)
(-3,224)
kWh
|
- |
$478
-
Tgal
|
- | - | |
07 | 2.8112: Combine utility meters | $385 | $200 | - | - | - | - | $385 | |
TOTAL RECOMMENDED | $192,208 | $215,575 |
$(-458.0)
(-19,050)
kWh
|
$9,803
-
MMBtu
|
$478
-
Tgal
|
$182,000 | $385 | ||
TOTAL IMPLEMENTED | $4,704 | $1,500 | - |
$4,319
-
MMBtu
|
- | - | $385 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs