ITAC Assessment: WI0334
ITAC logo
ITAC Assessment: WI0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Inner and Box Spring Components
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 130,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,179 1,928,781
kWh
Electricity Demand $38,439 4,741
kW-mo/yr
Electricity Fees $6,650 -
Natural Gas $35,671 8,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 4.441: Install automatic packing equipment $182,000 $200,000 - - - $182,000 -
02 2.8113: Purchase gas directly from a contract gas supplier $3,225 $500 - $3,225
-
MMBtu
- - -
03 2.2426: Use waste heat from flue gases to heat space conditioning air $2,932 $6,000 - $2,932
-
MMBtu
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $2,172 $6,200 $(-380.0)
(-15,826)
kWh
$2,552
-
MMBtu
- - -
05 2.7261: Install timers and/or thermostats $1,094 $800 - $1,094
-
MMBtu
- - -
06 3.4151: Minimize water usage $400 $1,875 $(-78.0)
(-3,224)
kWh
- $478
-
Tgal
- -
07 2.8112: Combine utility meters $385 $200 - - - - $385
TOTAL RECOMMENDED $192,208 $215,575 $(-458.0)
(-19,050)
kWh
$9,803
-
MMBtu
$478
-
Tgal
$182,000 $385
TOTAL IMPLEMENTED $4,704 $1,500 - $4,319
-
MMBtu
- - $385
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs