Assessment Year | 2022 |
---|---|
Principal Product | Transportation Trailers |
NAICS | 336999: All Other Transportation Equipment Manufacturing |
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
310,000
ft2
|
Annual Production | 2,600
units
|
Production Hrs. Annual | 5,512
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $163,500 | 2,654,400 |
kWh
|
$0.062 | |
Electricity Demand | $161,410 | 10,271 |
kW-mo/yr
|
$15.72 | |
Natural Gas | $187,531 | 19,601 |
MMBtu
|
$9.57 | |
Waste Disposal Costs | |||||
Water Usage | $2,471 | 259 |
Tgal
|
$9.54 | |
Water Disposal | $3,489 | 259 |
Tgal
|
$13.47 | |
TOTAL YEARLY COSTS | $518,401 | ||||
RECOMMENDED SAVINGS* | $111,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $32,663 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $45,807 | $72,000 | - | - |
$45,807
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,663 | $88,815 |
$20,948
342,295
kWh
|
$11,715
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,566 | $6,725 |
$19,566
319,710
kWh
|
- | - | - | |
04 | 4.212: Adopt in-house material generation | $9,686 | $17,700 |
$(-1,776.0)
(-29,014)
kWh
|
- | - | $11,462 | |
05 | 2.2437: Recover waste heat from equipment | $4,140 | $5,000 | - | - |
$4,140
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $111,862 | $190,240 |
$38,738
632,991
kWh
|
$11,715
-
kW-mo/yr
|
$49,947
-
MMBtu
|
$11,462 | ||
TOTAL IMPLEMENTED | $32,663 | $88,815 |
$20,948
342,295
kWh
|
$11,715
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs