ITAC Assessment: TT0263
ITAC logo
ITAC Assessment: TT0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Transportation Trailers
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 310,000
ft2
Annual Production 2,600
units
Production Hrs. Annual 5,512
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,500 2,654,400
kWh
Electricity Demand $161,410 10,271
kW-mo/yr
Natural Gas $187,531 19,601
MMBtu
Waste Disposal Costs
Water Usage $2,471 259
Tgal
Water Disposal $3,489 259
Tgal
TOTAL YEARLY COSTS $518,401
RECOMMENDED SAVINGS* $111,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $45,807 $72,000 - - $45,807
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,663 $88,815 $20,948
342,295
kWh
$11,715
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,566 $6,725 $19,566
319,710
kWh
- - -
04 4.212: Adopt in-house material generation $9,686 $17,700 $(-1,776.0)
(-29,014)
kWh
- - $11,462
05 2.2437: Recover waste heat from equipment $4,140 $5,000 - - $4,140
-
MMBtu
-
TOTAL RECOMMENDED $111,862 $190,240 $38,738
632,991
kWh
$11,715
-
kW-mo/yr
$49,947
-
MMBtu
$11,462
TOTAL IMPLEMENTED $32,663 $88,815 $20,948
342,295
kWh
$11,715
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs