Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,028

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0418 #01 Y:1998 Use demand controller or load shedder $2,020 $2,000
CO0420 #04 Y:1998 Use a less expensive method of waste removal $1,020 -
CO0420 #03 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $3,310 $330
CO0420 #02 Y:1998 Utilize higher efficiency lamps and/or ballasts $4,550 $11,840
CO0420 #01 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,225 $29,780
CO0415 #09 Y:1998 Use fixtures to reduce machine changeout times $3,340 $400
CO0415 #08 Y:1998 Use a less expensive method of waste removal $330 -
CO0415 #07 Y:1998 Use filtration, centrifuging to remove contaminants $420 -
CO0415 #06 Y:1998 Use filtration, centrifuging to remove contaminants $4,830 $2,450
CO0415 #05 Y:1998 Use most efficient type of electric motors $100 $238
CO0415 #04 Y:1998 Install compressor air intakes in coolest locations $700 $1,250
CO0415 #03 Y:1998 Use demand controller or load shedder $810 $1,580
CO0415 #02 Y:1998 Utilize higher efficiency lamps and/or ballasts $586 $334
CO0415 #01 Y:1998 Recover waste heat from equipment $1,850 $3,500
CO0414 #08 Y:1998 Use only amount of packaging material necessary $2,560 $300
CO0414 #07 Y:1998 Optimize lot sizes to reduce inventory carrying costs $1,840 $4,260
CO0414 #06 Y:1998 Move product using mechanical means $6,760 $12,680
CO0414 #05 Y:1998 Optimize production lot sizes and inventories $88,140 $7,100
CO0414 #04 Y:1998 Regrind, reuse, or sell scrap plastic parts $120 -
CO0414 #03 Y:1998 Use a less expensive method of waste removal $670 -