| Assessment Year | 1998 |
|---|---|
| Principal Product | thermoformed plastic components & packages |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 73 |
| Plant Area |
41,750
ft2
|
| Annual Production | 416,000,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $34,916 | 2,113,423 |
kWh
|
$0.017 |
| Electricity Demand | $68,547 | 5,080 |
kW-mo/yr
|
$13.49 |
| Electricity Fees | $1,581 | - |
|
- |
| Natural Gas | $5,289 | 1,190 |
MMBtu
|
$4.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,850 | $3,500 | n/a | - | - |
$1,850
-
MMBtu
|
- | - | - | - | - |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $586 | $334 | n/a |
$191
11,137
kWh
|
$395
-
kW-mo/yr
|
- | - | - | - | - | - |
| 03 | 2.3191: Use demand controller or load shedder | $810 | $1,580 | n/a | - |
$810
-
kW-mo/yr
|
- | - | - | - | - | - |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $700 | $1,250 | n/a |
$250
14,654
kWh
|
$450
-
kW-mo/yr
|
- | - | - | - | - | - |
| 05 | 2.4133: Use most efficient type of electric motors | $100 | $238 | n/a |
$30
1,758
kWh
|
$70
-
kW-mo/yr
|
- | - | - | - | - | - |
| 06 | 3.3122: Use filtration, centrifuging to remove contaminants | $4,830 | $2,450 | n/a | - | - | - |
$5,020
-
gal
|
- | - | $(-190.0) | - |
| 07 | 3.3122: Use filtration, centrifuging to remove contaminants | $420 | - | n/a | - | - | - |
$210
-
gal
|
- | $150 | $60 | - |
| 08 | 3.6192: Use a less expensive method of waste removal | $330 | - | n/a | - | - | - | - |
$330
-
lb
|
- | - | - |
| 09 | 4.621: Use fixtures to reduce machine changeout times | $3,340 | $400 | n/a | - | - | - | - | - | - | - | $3,340 |
| TOTAL RECOMMENDED | $12,966 | $9,752 |
$471
27,549
kWh
|
$1,725
-
kW-mo/yr
|
$1,850
-
MMBtu
|
$5,230
-
gal
|
$330
-
lb
|
$150 | $(-130.0) | $3,340 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs