Assessment Year | 1998 |
---|---|
Principal Product | thermoformed plastic components & packages |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 73 |
Plant Area |
41,750
ft2
|
Annual Production | 416,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,916 | 2,113,423 |
kWh
|
$0.017 |
Electricity Demand | $68,547 | 5,080 |
kW-mo/yr
|
$13.49 |
Electricity Fees | $1,581 | - |
|
- |
Natural Gas | $5,289 | 1,190 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,850 | $3,500 | n/a | - | - |
$1,850
-
MMBtu
|
- | - | - | - | - |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $586 | $334 | n/a |
$191
11,137
kWh
|
$395
-
kW-mo/yr
|
- | - | - | - | - | - |
03 | 2.3191: Use demand controller or load shedder | $810 | $1,580 | n/a | - |
$810
-
kW-mo/yr
|
- | - | - | - | - | - |
04 | 2.4221: Install compressor air intakes in coolest locations | $700 | $1,250 | n/a |
$250
14,654
kWh
|
$450
-
kW-mo/yr
|
- | - | - | - | - | - |
05 | 2.4133: Use most efficient type of electric motors | $100 | $238 | n/a |
$30
1,758
kWh
|
$70
-
kW-mo/yr
|
- | - | - | - | - | - |
06 | 3.3122: Use filtration, centrifuging to remove contaminants | $4,830 | $2,450 | n/a | - | - | - |
$5,020
-
gal
|
- | - | $(-190.0) | - |
07 | 3.3122: Use filtration, centrifuging to remove contaminants | $420 | - | n/a | - | - | - |
$210
-
gal
|
- | $150 | $60 | - |
08 | 3.6192: Use a less expensive method of waste removal | $330 | - | n/a | - | - | - | - |
$330
-
lb
|
- | - | - |
09 | 4.621: Use fixtures to reduce machine changeout times | $3,340 | $400 | n/a | - | - | - | - | - | - | - | $3,340 |
TOTAL RECOMMENDED | $12,966 | $9,752 |
$471
27,549
kWh
|
$1,725
-
kW-mo/yr
|
$1,850
-
MMBtu
|
$5,230
-
gal
|
$330
-
lb
|
$150 | $(-130.0) | $3,340 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs