Assessment Year | 1998 |
---|---|
Principal Product | automation & high-speed retrieval equipment |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
40,000
ft2
|
Annual Production | 84
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,139 | 648,300 |
kWh
|
$0.028 |
Electricity Demand | $13,385 | 1,544 |
kW-mo/yr
|
$8.67 |
Electricity Fees | $144 | - |
|
- |
Natural Gas | $5,012 | 1,267 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,020 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $2,020 | $2,000 | - |
$2,020
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,800 | $700 |
$400
24,619
kWh
|
$1,830
-
kW-mo/yr
|
$(-430.0)
-
MMBtu
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $640 | $330 |
$180
10,844
kWh
|
$460
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 3.3122: Use filtration, centrifuging to remove contaminants | $7,100 | - | - | - | - |
$2,530
-
gal
|
- | $1,090 | $280 | $3,200 | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $7,130 | $500 | - | - | - | - |
$550
-
lb
|
- | $6,580 | - | |
06 | 3.8132: Use less toxic and volatile solvent substitutes | $210 | - | - | - | - | - | - | - | $210 | - | |
07 | 4.441: Install automatic packing equipment | $10,560 | $4,510 |
$(-70.0)
(-4,103)
kWh
|
$(-240.0)
-
kW-mo/yr
|
- | - | - | $8,840 | $2,030 | - | |
TOTAL RECOMMENDED | $29,460 | $8,040 |
$510
31,360
kWh
|
$4,070
-
kW-mo/yr
|
$(-430.0)
-
MMBtu
|
$2,530
-
gal
|
$550
-
lb
|
$9,930 | $9,100 | $3,200 | ||
TOTAL IMPLEMENTED | $15,020 | $7,540 |
$510
31,360
kWh
|
$4,070
-
kW-mo/yr
|
$(-430.0)
-
MMBtu
|
- | - | $8,840 | $2,030 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs