Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Sodium Hyaluronate
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 112,000
ft2
Annual Production 200
units
Production Hrs. Annual 2,500
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,122 6,357,300
kWh
Electricity Demand $129,894 13,330
kW-mo/yr
Natural Gas $145,276 26,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7134: Use photocell controls $112 $420 $112
2,100
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,596 $995 $5,279
99,426
kWh
$1,317
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,389 $1,210 $1,389
26,185
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $13,609 $175 $10,894
205,159
kWh
$2,715
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $871 $22 $465
8,750
kWh
$406
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $525 $840 $299
5,631
kWh
$226
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $691 $752 - - $691
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,163 $70 $1,154
21,750
kWh
$1,009
-
kW-mo/yr
-
09 2.4133: Use most efficient type of electric motors $1,214 $2,400 $648
12,206
kWh
$566
-
kW-mo/yr
-
10 2.2136: Install / repair insulation on steam lines $428 $579 $236
4,451
kWh
- $192
-
MMBtu
11 2.7221: Lower temperature during the winter season and vice-versa $6,841 $1,000 $5,361
100,959
kWh
- $1,480
-
MMBtu
TOTAL RECOMMENDED $34,439 $8,463 $25,837
486,617
kWh
$6,239
-
kW-mo/yr
$2,363
-
MMBtu
TOTAL IMPLEMENTED $13,352 $6,028 $9,171
172,768
kWh
$3,298
-
kW-mo/yr
$883
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs