Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,758

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0178 #02 Y:1999 Utilize higher efficiency lamps and/or ballasts $511 $936
AR0178 #01 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $1,932 $500
AR0180 #04 Y:1999 Install equipment to move product $124,671 $45,000
AR0180 #03 Y:1999 Automate finishing process $31,168 $6,888
AR0180 #02 Y:1999 Utilize energy-efficient belts and other improved mechanisms $452 -
AR0180 #01 Y:1999 Use most efficient type of electric motors $110 $258
AR0176 #06 Y:1999 Replace existing equipment with more suitable substitutes $8,964 $17,500
AR0176 #05 Y:1999 Use less wasteful packaging $2,479 $1,300
AR0176 #04 Y:1999 Utilize higher efficiency lamps and/or ballasts $946 $2,237
AR0176 #03 Y:1999 Utilize higher efficiency lamps and/or ballasts $30 $287
AR0176 #02 Y:1999 Install compressor air intakes in coolest locations $4,051 $360
AR0176 #01 Y:1999 Use most efficient type of electric motors $659 $1,135
AR0175 #04 Y:1999 Increase use of automation $1,249 $3,000
AR0175 #03 Y:1999 Increase use of automation $5,548 $8,000
AR0175 #02 Y:1999 Recover waste heat from equipment $993 $153
AR0175 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $142 -
AR0174 #06 Y:1999 Train operators for maximum operating efficiency $6,894 $280
AR0174 #05 Y:1999 Install compressor air intakes in coolest locations $4,046 $402
AR0174 #04 Y:1999 Reduce illumination to minimum necessary levels $22,202 $180
AR0174 #03 Y:1999 Utilize higher efficiency lamps and/or ballasts $7,097 $21,814