Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,515

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0320 #09 Y:2024 Eliminate or reduce compressed air usage $8,140 $26,000
TT0320 #07 Y:2024 Use solar heat to make electricty $57,337 $238,118
TT0320 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $6,080
TT0320 #05 Y:2024 Meter recycled water (to reduce sewer charges) $6,052 $7,500
TT0320 #03 Y:2024 Recover waste heat from equipment $17,320 $15,000
TT0320 #01 Y:2024 Adopt in-house material generation $30,976 $12,000
TT0316 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $1,345
TT0316 #10 Y:2024 Recover waste heat from equipment $5,587 $1,500
TT0316 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $7,504 $60
TT0316 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,806 $12,000
TT0316 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $17,400 $10,380
TT0316 #03 Y:2024 Change rate schedules or other changes in utility service $147,843 $200,000
TT0316 #02 Y:2024 Use solar heat to make electricty $259,778 $1,375,785
TT0316 #01 Y:2024 Change rate schedules or other changes in utility service $1,156,718 $75,000
TT0313 #12 Y:2024 Use solar heat to make electricty $81,048 $301,095
TT0313 #10 Y:2024 Change procedures / equipment / operating conditions $261,275 $200,000
TT0313 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $14,234 $9,800
TT0313 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,284 $1,200
TT0313 #07 Y:2024 Recover waste heat from equipment $29,164 $15,000
TT0313 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,134 $3,000