Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,562

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0334 #09 Y:2025 Utilize controls to operate equipment only when needed $303 $435
TT0334 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,367 $1,185
TT0334 #06 Y:2025 Recover waste heat from equipment $3,038 $5,000
TT0334 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,719 $765
TT0334 #04 Y:2025 Upgrade controls on compressors $6,325 $21,000
TT0334 #02 Y:2025 Apply for tax-free status for energy purchases $7,793 $70
TT0334 #01 Y:2025 Pay bills on time to avoid late fees $10,077 -
TT0327 #08 Y:2025 Optimize plant power factor $8,101 $31,875
TT0327 #07 Y:2025 Initiate a program to acquire iso certification $17,852 $35,000
TT0327 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $998 $120
TT0327 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $3,321 -
TT0324 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $2,799 $60
TT0324 #08 Y:2024 Utilize energy-efficient belts and other improved mechanisms $2,846 $500
TT0324 #07 Y:2024 Upgrade controls on compressors $3,929 $13,000
TT0324 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,316 $1,305
TT0324 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $13,732 $35,000
TT0324 #04 Y:2024 Optimize plant power factor $29,835 $24,750
TT0324 #01 Y:2024 Adopt in-house material generation $160,334 $75,000
TT0330 #10 Y:2024 Increase amount of condensate returned $928 $5,000
TT0330 #09 Y:2024 Preheat boiler makeup water with waste process heat $2,928 $11,800