Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,580

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0335 #08 Y:2025 Use solar heat to make electricty $36,172 $520,500
TT0335 #05 Y:2025 Install vinyl strip / high speed / air curtain doors $12,543 $4,000
TT0335 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $9,409 $1,885
TT0335 #02 Y:2025 Initiate a program to acquire iso certification $78,715 $15,000
TT0335 #01 Y:2025 Use power during off-peak periods $1,852 $60
TT0343 #08 Y:2025 Utilize controls to operate equipment only when needed $293 $170
TT0343 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,402 $1,500
TT0343 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $17,284 $4,000
TT0343 #02 Y:2025 Use solar heat to make electricty $51,928 $289,763
TT0343 #01 Y:2025 Modify process to reduce material use/cost $106,940 $8,000
TT0334 #09 Y:2025 Utilize controls to operate equipment only when needed $303 $435
TT0334 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,367 $1,185
TT0334 #06 Y:2025 Recover waste heat from equipment $3,038 $5,000
TT0334 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,719 $765
TT0334 #04 Y:2025 Upgrade controls on compressors $6,325 $21,000
TT0334 #02 Y:2025 Apply for tax-free status for energy purchases $7,793 $70
TT0334 #01 Y:2025 Pay bills on time to avoid late fees $10,077 -
TT0340 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $833 $700
TT0340 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,026 $16,500
TT0340 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $44,176 $200,000