2,536
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0323 #08 Y:2024 | 08 | 2024 | Use solar heat for heat | $26,365 | $221,500 | |
| TT0323 #07 Y:2024 | 07 | 2024 | Air condition only space necessary | $12,931 | $18,000 | |
| TT0323 #06 Y:2024 | 06 | 2024 | Utilize outside contracting | $27,937 | $30,000 | |
| TT0323 #03 Y:2024 | 03 | 2024 | Utilize controls to operate equipment only when needed | $1,028 | $400 | |
| TT0323 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,234 | $2,520 | |
| TT0320 #09 Y:2024 | 09 | 2024 | Eliminate or reduce compressed air usage | $8,140 | $26,000 | |
| TT0320 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $57,337 | $238,118 | |
| TT0320 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,087 | $6,080 | |
| TT0320 #05 Y:2024 | 05 | 2024 | Meter recycled water (to reduce sewer charges) | $6,052 | $7,500 | |
| TT0320 #03 Y:2024 | 03 | 2024 | Recover waste heat from equipment | $17,320 | $15,000 | |
| TT0320 #01 Y:2024 | 01 | 2024 | Adopt in-house material generation | $30,976 | $12,000 | |
| TT0317 #16 Y:2024 | 16 | 2024 | Upgrade obsolete equipment | $4,116 | $50,000 | |
| TT0317 #15 Y:2024 | 15 | 2024 | Eliminate or reduce compressed air usage | $8,295 | $40,000 | |
| TT0317 #13 Y:2024 | 13 | 2024 | Adopt in-house material generation | $205,758 | $600,000 | |
| TT0317 #12 Y:2024 | 12 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,299 | $16,125 | |
| TT0317 #11 Y:2024 | 11 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $22,558 | $39,000 | |
| TT0317 #10 Y:2024 | 10 | 2024 | Minimize boiler blowdown with better feedwater treatment | $56,902 | $80,000 | |
| TT0317 #09 Y:2024 | 09 | 2024 | Upgrade controls on compressors | $6,847 | $8,500 | |
| TT0317 #08 Y:2024 | 08 | 2024 | Initiate a program to acquire iso certification | $64,353 | $60,000 | |
| TT0317 #06 Y:2024 | 06 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $169,411 | $120,000 |