2,459
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0308 #06 Y:2023 | 06 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $642 | $1,540 | |
TT0308 #05 Y:2023 | 05 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,800 | $225 | |
TT0308 #04 Y:2023 | 04 | 2023 | Apply for tax-free status for energy purchases | $3,092 | - | |
TT0308 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $6,781 | $4,500 | |
TT0308 #01 Y:2023 | 01 | 2023 | Use solar heat to make electricty | $41,746 | $279,600 | |
TT0309 #10 Y:2023 | 10 | 2023 | Substitute compressed air cooling with water or air cooling | $2,373 | $430 | |
TT0309 #09 Y:2023 | 09 | 2023 | Meter waste water | $4,799 | $1,100 | |
TT0309 #08 Y:2023 | 08 | 2023 | Eliminate or reduce compressed air usage | $7,336 | $20,480 | |
TT0309 #07 Y:2023 | 07 | 2023 | Turn off equipment during breaks, reduce operating time | $10,333 | - | |
TT0309 #06 Y:2023 | 06 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,028 | $1,500 | |
TT0309 #05 Y:2023 | 05 | 2023 | Reschedule plant operations or reduce load to avoid peaks | $16,687 | - | |
TT0309 #04 Y:2023 | 04 | 2023 | Replace boiler | $18,200 | $104,000 | |
TT0309 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $25,893 | $157,700 | |
TT0309 #02 Y:2023 | 02 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $30,407 | $4,800 | |
TT0309 #01 Y:2023 | 01 | 2023 | Use computer programs to optimize hvac performance | $83,523 | $250,000 | |
TT0305 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $82 | $174 | |
TT0305 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $4,366 | $3,000 | |
TT0305 #02 Y:2023 | 02 | 2023 | Adopt in-house material generation | $34,931 | $146,400 | |
TT0305 #01 Y:2023 | 01 | 2023 | Adopt in-house material generation | $50,976 | $15,000 | |
TT0302 #08 Y:2023 | 08 | 2023 | Substitute compressed air cooling with water or air cooling | $2,956 | $965 |