Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,536

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0323 #08 Y:2024 Use solar heat for heat $26,365 $221,500
TT0323 #07 Y:2024 Air condition only space necessary $12,931 $18,000
TT0323 #06 Y:2024 Utilize outside contracting $27,937 $30,000
TT0323 #03 Y:2024 Utilize controls to operate equipment only when needed $1,028 $400
TT0323 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8,234 $2,520
TT0320 #09 Y:2024 Eliminate or reduce compressed air usage $8,140 $26,000
TT0320 #07 Y:2024 Use solar heat to make electricty $57,337 $238,118
TT0320 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $6,080
TT0320 #05 Y:2024 Meter recycled water (to reduce sewer charges) $6,052 $7,500
TT0320 #03 Y:2024 Recover waste heat from equipment $17,320 $15,000
TT0320 #01 Y:2024 Adopt in-house material generation $30,976 $12,000
TT0317 #16 Y:2024 Upgrade obsolete equipment $4,116 $50,000
TT0317 #15 Y:2024 Eliminate or reduce compressed air usage $8,295 $40,000
TT0317 #13 Y:2024 Adopt in-house material generation $205,758 $600,000
TT0317 #12 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,299 $16,125
TT0317 #11 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $22,558 $39,000
TT0317 #10 Y:2024 Minimize boiler blowdown with better feedwater treatment $56,902 $80,000
TT0317 #09 Y:2024 Upgrade controls on compressors $6,847 $8,500
TT0317 #08 Y:2024 Initiate a program to acquire iso certification $64,353 $60,000
TT0317 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $169,411 $120,000