ITAC Assessment: TT0313
ITAC logo
ITAC Assessment: TT0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rubber Weather Seals for Automotive Industry
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 203
Plant Area 161,402
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $734,270 10,032,500
kWh
Electricity Demand $295,501 20,678
kW-mo/yr
Natural Gas $248,716 22,810
MMBtu
Waste Disposal Costs
Water Usage $5,262 526
Tgal
TOTAL YEARLY COSTS $1,283,749
RECOMMENDED SAVINGS* $556,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,143 $60 $7,143
97,595
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,255 $2,625 $34,255
467,964
kWh
- - - -
03 3.4154: Eliminate leaks in water lines and valves $4,207 $340 - - - $4,207
-
Tgal
-
04 2.4239: Eliminate or reduce compressed air usage $21,724 $2,600 $21,724
296,774
kWh
- - - -
05 2.2511: Insulate bare equipment $640 $87 - - $640
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,134 $3,000 $6,787
92,720
kWh
$1,347
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $29,164 $15,000 - - $29,164
-
MMBtu
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,284 $1,200 $1,723
23,544
kWh
$561
-
kW-mo/yr
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,234 $9,800 $12,159
166,102
kWh
$2,075
-
kW-mo/yr
- - -
10 3.1191: Change procedures / equipment / operating conditions $261,275 $200,000 - - - - $261,275
11 2.4322: Use or replace with energy efficient substitutes $92,752 $120,000 $23,597
322,368
kWh
$3,155
-
kW-mo/yr
- - $66,000
12 2.9114: Use solar heat to make electricty $81,048 $301,095 $81,048
1,107,216
kWh
- - - -
TOTAL RECOMMENDED $556,861 $655,807 $188,436
2,574,283
kWh
$7,138
-
kW-mo/yr
$29,805
-
MMBtu
$4,207
-
Tgal
$327,275
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs