| Assessment Year | 2025 |
|---|---|
| Principal Product | varied plastic parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 143 |
| Plant Area |
58,500
ft2
|
| Annual Production | 2,333,779,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,109,551 | 15,462,647 |
kWh
|
$0.072 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,183 | 3,051 |
Tgal
|
$4.32 | |
| Water Disposal | $10,325 | 3,051 |
Tgal
|
$3.38 | |
| TOTAL YEARLY COSTS | $1,133,059 | ||||
| RECOMMENDED SAVINGS* | $84,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $3,877 | $6,000 |
$3,877
54,004
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,710 | $120 |
$1,710
23,834
kWh
|
- | |
| 03 | 2.6127: Maintain air filters by cleaning or replacement | $2,122 | $500 |
$2,122
29,565
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $17,800 | $5,600 |
$17,800
247,880
kWh
|
- | |
| 05 | 2.2622: Replace existing chiller with high efficiency model | $16,241 | $120,000 |
$16,241
226,200
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $155 | - |
$155
2,156
kWh
|
- | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $2,825 | - |
$2,825
39,360
kWh
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $38,188 | $16,280 |
$38,188
531,780
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $463 | $948 |
$306
4,269
kWh
|
$157 | |
| 10 | 2.7135: Install occupancy sensors | $882 | $1,200 |
$882
12,106
kWh
|
- | |
| TOTAL RECOMMENDED | $84,263 | $150,648 |
$84,106
1,171,154
kWh
|
$157 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings | |||