Assessment Year | 2024 |
---|---|
Principal Product | Fiberglass Reinforced Building Panels |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
80,000
ft2
|
Annual Production | 3,405
thousand feet
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $265,498 | 3,613,824 |
kWh
|
$0.073 | |
Electricity Demand | $111,553 | 9,880 |
kW-mo/yr
|
$11.29 | |
Natural Gas | $314,200 | 39,104 |
MMBtu
|
$8.03 | |
Waste Disposal Costs | |||||
Water Usage | $5,843 | 751 |
Tgal
|
$7.78 | |
Water Disposal | $6,184 | 751 |
Tgal
|
$8.23 | |
TOTAL YEARLY COSTS | $703,278 | ||||
RECOMMENDED SAVINGS* | $103,429 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2314: Replace heat treating oven with more efficient unit | $44,634 | $22,300 |
$14,432
196,359
kWh
|
$3,620
-
kW-mo/yr
|
- | $26,582 | |
02 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $13,017 | $16,000 | - | - |
$13,017
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,328 | $1,500 |
$12,253
166,709
kWh
|
$3,075
-
kW-mo/yr
|
- | - | |
04 | 2.4237: Substitute compressed air cooling with water or air cooling | $10,616 | $66,000 |
$10,616
144,436
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,389 | $2,000 |
$3,108
42,282
kWh
|
$2,281
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $5,067 | $20,480 |
$5,067
68,933
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,015 | $15,600 |
$5,015
68,236
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,159 | $1,700 |
$3,211
43,680
kWh
|
$948
-
kW-mo/yr
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $204 | $184 |
$150
2,046
kWh
|
$54
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $103,429 | $145,764 |
$53,852
732,681
kWh
|
$9,978
-
kW-mo/yr
|
$13,017
-
MMBtu
|
$26,582 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs