ITAC Assessment: TT0315
ITAC logo
ITAC Assessment: TT0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fiberglass Reinforced Building Panels
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 3,405
thousand feet
Production Hrs. Annual 7,344
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,498 3,613,824
kWh
Electricity Demand $111,553 9,880
kW-mo/yr
Natural Gas $314,200 39,104
MMBtu
Waste Disposal Costs
Water Usage $5,843 751
Tgal
Water Disposal $6,184 751
Tgal
TOTAL YEARLY COSTS $703,278
RECOMMENDED SAVINGS* $103,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2314: Replace heat treating oven with more efficient unit $44,634 $22,300 $14,432
196,359
kWh
$3,620
-
kW-mo/yr
- $26,582
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $13,017 $16,000 - - $13,017
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,328 $1,500 $12,253
166,709
kWh
$3,075
-
kW-mo/yr
- -
04 2.4237: Substitute compressed air cooling with water or air cooling $10,616 $66,000 $10,616
144,436
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,389 $2,000 $3,108
42,282
kWh
$2,281
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $5,067 $20,480 $5,067
68,933
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,015 $15,600 $5,015
68,236
kWh
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,159 $1,700 $3,211
43,680
kWh
$948
-
kW-mo/yr
- -
09 2.4133: Use most efficient type of electric motors $204 $184 $150
2,046
kWh
$54
-
kW-mo/yr
- -
TOTAL RECOMMENDED $103,429 $145,764 $53,852
732,681
kWh
$9,978
-
kW-mo/yr
$13,017
-
MMBtu
$26,582
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs