ITAC Assessment: OK0433
ITAC logo
ITAC Assessment: OK0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Animal Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 150,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 6,188
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,175 2,589,097
kWh
Natural Gas $55,846 18,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $24,035 - $24,035
230,070
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,263 $5,500 $5,263
77,374
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,725 $4,396 $4,725
57,737
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,239 - $1,239
18,171
kWh
-
05 2.2511: Insulate bare equipment $1,205 $1,665 - $1,205
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $57 $359
4,396
kWh
-
TOTAL RECOMMENDED $36,826 $11,618 $35,621
387,748
kWh
$1,205
-
MMBtu
TOTAL IMPLEMENTED $28,760 $4,396 $28,760
287,807
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs