ITAC Assessment: OR0210
ITAC logo
ITAC Assessment: OR0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Powder Coating
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 20
Plant Area
n/a
Annual Production 26,800,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,156 360,785
kWh
Natural Gas $16,323 3,916
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings
01 2.2511: Insulate bare equipment $1,701 $1,030 $1,701
41,325
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $220 $300 $220
3,810
kWh
-
03 2.4133: Use most efficient type of electric motors $43 $139 $43
879
kWh
-
04 3.1175: Use a different or recycled raw material $124,000 $118,900 - $124,000
-
lb
TOTAL RECOMMENDED $125,964 $120,369 $1,964
46,014
kWh
$124,000
-
lb
TOTAL IMPLEMENTED $124,263 $119,339 $263
4,689
kWh
$124,000
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs