Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,284

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM27 #07 Y:2025 Close holes and openings in building such as broken windows $31 $76
MUCM27 #06 Y:2025 Close holes and openings in building such as broken windows $37 $11
MUCM27 #05 Y:2025 Lower temperature during the winter season and vice-versa $77 -
MUCM27 #04 Y:2025 Install occupancy sensors $263 $372
MUCM27 #03 Y:2025 Use photocell controls $269 $213
MUCM27 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $24 $11
MUCM27 #01 Y:2025 Turn off equipment when not in use $1,123 -
MU0063 #08 Y:2025 Install outside air damper / economizer on hvac unit $51,201 $13,812
MU0063 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,852 $15,875
MU0062 #05 Y:2024 Reduce illumination to minimum necessary levels $216 -
MU0062 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $1,416 $780
MU0061 #09 Y:2024 Install partitions to reduce size of conditioned space $370 $1,608
MU0061 #08 Y:2024 Install timers and/or thermostats $393 $580
MU0061 #07 Y:2024 Use radiant heater for spot heating $2,592 $10,260
MU0061 #05 Y:2024 Install occupancy sensors $246 $339
MU0061 #01 Y:2024 Recharge batteries on during off-peak demand periods $3,468 $4,140
MUCM26 #01 Y:2024 Replace fossil fuel equipment with electrical equipment $2,717 -
MU0060 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $1,220 $5,000
MU0060 #06 Y:2024 Use automatic cleaning equipment $44,873 $110,000
MU0060 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $19,778 $24,085