ITAC Assessment: MU0055
ITAC logo
ITAC Assessment: MU0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic chain
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 69,000
ft2
Annual Production 18,250
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,111 1,320,920
kWh
Electricity Fees $258 -
LPG $23,521 1,063
MMBtu
Other Gas $2,062 1
MMBtu
TOTAL YEARLY COSTS $190,951
RECOMMENDED SAVINGS* $62,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,978 $12,953 $1,978
15,212
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,002 - $1,002
7,704
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $2,601 - $2,601
20,007
kWh
-
04 2.7135: Install occupancy sensors $7,346 $2,376 $7,346
56,507
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $1,775 - - $1,775
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $31,868 $12,988 $(-274.0)
(-2,108)
kWh
$32,142
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $113 $641 - $113
-
MMBtu
08 2.9114: Use solar heat to make electricty $15,989 $163,856 $15,989
122,990
kWh
-
TOTAL RECOMMENDED $62,671 $192,814 $28,642
220,312
kWh
$34,029
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs