Assessment Year | 2024 |
---|---|
Principal Product | Plastic chain |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 92 |
Plant Area |
69,000
ft2
|
Annual Production | 18,250
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $165,111 | 1,320,920 |
kWh
|
$0.12 |
Electricity Fees | $258 | - |
|
- |
LPG | $23,521 | 1,063 |
MMBtu
|
$22.13 |
Other Gas | $2,062 | 1 |
MMBtu
|
$2,061.85 |
TOTAL YEARLY COSTS | $190,951 | |||
RECOMMENDED SAVINGS* | $62,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,978 | $12,953 |
$1,978
15,212
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,002 | - |
$1,002
7,704
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,601 | - |
$2,601
20,007
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $7,346 | $2,376 |
$7,346
56,507
kWh
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,775 | - | - |
$1,775
-
MMBtu
|
|
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $31,868 | $12,988 |
$(-274.0)
(-2,108)
kWh
|
$32,142
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $113 | $641 | - |
$113
-
MMBtu
|
|
08 | 2.9114: Use solar heat to make electricty | $15,989 | $163,856 |
$15,989
122,990
kWh
|
- | |
TOTAL RECOMMENDED | $62,671 | $192,814 |
$28,642
220,312
kWh
|
$34,029
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs