ITAC Assessment: MU0060
ITAC logo
ITAC Assessment: MU0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Molded Rubber Goods
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 51,000
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 4,095
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,744 3,687,201
kWh
Electricity Demand $241,250 11,559
kW-mo/yr
Electricity Fees $33,563 -
Natural Gas $53,531 6,501
MMBtu
Other Gas $1,009 1
MMBtu
TOTAL YEARLY COSTS $585,096
RECOMMENDED SAVINGS* $328,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings By-product Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $328 - $153
2,185
kWh
$175
-
kW-mo/yr
- - - - -
02 2.4237: Substitute compressed air cooling with water or air cooling $126,131 $8,400 $5,151
73,582
kWh
$4,500
-
kW-mo/yr
- - - - $116,480
03 2.2449: Recover heat from exhausted steam, hot air or hot water $1,517 $1,184 - - $1,517
-
MMBtu
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,778 $24,085 $10,556
150,797
kWh
$9,222
-
kW-mo/yr
- - - - -
05 2.4321: Upgrade obsolete equipment $76,249 $151,800 - - - - - - $76,249
06 3.2172: Use automatic cleaning equipment $44,873 $110,000 $162
2,314
kWh
$142
-
kW-mo/yr
$1,669
-
MMBtu
- - - $42,900
07 3.7112: Use squeegees, mops, and vacuums for floor cleaning $1,733 $5,000 - - - $1,733 - - -
08 2.1321: Replace fossil fuel equipment with electrical equipment $1,220 $5,000 - - - - $1,220 - -
09 2.4322: Use or replace with energy efficient substitutes $14,407 $66,000 $5,166
73,797
kWh
$9,241
-
kW-mo/yr
- - - - -
10 2.9114: Use solar heat to make electricty $42,322 $490,355 $30,300
216,426
kWh
- - - - $12,022 -
TOTAL RECOMMENDED $328,559 $861,824 $51,487
519,101
kWh
$23,281
-
kW-mo/yr
$3,186
-
MMBtu
$1,733 $1,220 $12,022 $235,629
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs