Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,550

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0210 #04 Y:2025 Install automatic stack damper $73,852 $1,600
IP0210 #03 Y:2025 Conserve energy by efficient use of vending machines $1,349 -
IP0209 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $7,200 $1,306
IP0209 #06 Y:2025 Install automatic stack damper $9,546 $1,395
IP0209 #04 Y:2025 Install outside air damper / economizer on hvac unit $336 -
IP0209 #03 Y:2025 Chill water to the highest temperature possible $910 -
IP0209 #02 Y:2025 Upgrade controls on compressors $4,072 -
IP0208 #09 Y:2025 Install compressor air intakes in coolest locations $940 $1,742
IP0208 #08 Y:2025 Optimize plant power factor $23,307 $34,470
IP0208 #06 Y:2025 Install occupancy sensors $705 $200
IP0208 #05 Y:2025 Install or upgrade insulation on hvac distribution systems $1,484 $373
IP0208 #04 Y:2025 Shut off cooling if cold outside air will cool process $1,666 $82
IP0208 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $524 -
IP0208 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,420 $50
IP0208 #01 Y:2025 Turn off equipment during breaks, reduce operating time $3,572 -
IP0207 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,969 $3,653
IP0207 #04 Y:2025 Install occupancy sensors $970 $1,387
IP0207 #03 Y:2025 Use or replace with energy efficient substitutes $184 $227
IP0207 #02 Y:2025 Optimize plant power factor $7,162 $5,708
IP0207 #01 Y:2025 Lower temperature during the winter season and vice-versa $7,560 -