ITAC Assessment: IP0201
ITAC logo
ITAC Assessment: IP0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Automotive Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 262
Plant Area 218,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 6,260
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $448,019 7,080,914
kWh
Electricity Demand $233,713 14,717
kW-mo/yr
Electricity Fees $36,328 -
Natural Gas $20,968 2,358
MMBtu
Waste Disposal Costs
Water Usage $7,230 1,359
Tgal
Water Disposal $13,441 1,351
Tgal
TOTAL YEARLY COSTS $759,699
RECOMMENDED SAVINGS* $224,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.6218: Turn off equipment when not in use $55,084 - $55,084
874,348
kWh
- - -
02 3.1191: Change procedures / equipment / operating conditions $9,654 - $7,176
113,912
kWh
$2,478
-
kW-mo/yr
- -
03 2.8117: Install sub-metering equipment $3,904 $700 - - - $3,904
-
Tgal
04 2.6231: Utilize controls to operate equipment only when needed $133,638 $39,257 $133,638
2,121,235
kWh
- - -
05 2.2437: Recover waste heat from equipment $4,991 $1,471 - - $4,991
-
MMBtu
-
06 2.7135: Install occupancy sensors $2,678 $1,198 $1,805
28,646
kWh
$873
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $3,237 $2,101 $1,915
30,397
kWh
$1,322
-
kW-mo/yr
- -
08 2.4322: Use or replace with energy efficient substitutes $10,830 $25,000 $8,334
132,289
kWh
$2,496
-
kW-mo/yr
- -
TOTAL RECOMMENDED $224,016 $69,727 $207,952
3,300,827
kWh
$7,169
-
kW-mo/yr
$4,991
-
MMBtu
$3,904
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs