Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,774

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0978 #06 Y:2024 Use solar heat to make electricty $310,364 $5,706,740
GT0978 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $23,328 $36,015
GT0978 #04 Y:2024 Conserve energy by efficient use of vending machines $292 $270
GT0978 #01 Y:2024 Apply for tax-free status for energy purchases $14,430 $400
GT0976 #06 Y:2024 Use solar heat to make electricty $273,272 $5,081,734
GT0976 #05 Y:2024 Optimize plant power factor $4,240 $13,403
GT0976 #04 Y:2024 Reduce space conditioning during non-working hours $20,799 $15,000
GT0976 #02 Y:2024 Install occupancy sensors $20,852 $2,185
GT0976 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $12,289 $800
GT0975 #04 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $39,992 $87,500
GT0975 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,280 $1,334
GT0975 #02 Y:2024 Install / repair insulation on steam lines $3,668 $2,732
GT0975 #01 Y:2024 Install timers on light switches in little used areas $442 $197
UF0611 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,650 $720
UF0611 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $5,901 $7,320
UF0611 #02 Y:2024 Utilize controls to operate equipment only when needed $36,892 $25,400
GT0974 #09 Y:2023 Use solar heat to make electricty $32,346 $469,616
GT0974 #03 Y:2023 Turn off equipment when not in use $2,209 $400
GT0974 #02 Y:2023 Conserve energy by efficient use of vending machines $1,006 $180
GT0973 #07 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $27,850 $175,000