612
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0254 #08 Y:2025 | 08 | 2025 | Add/modify equipment to improve drying process | $88,915 | $400,000 | |
| DL0254 #07 Y:2025 | 07 | 2025 | Replace obsolete burners with more efficient ones | $11,855 | $58,000 | |
| DL0254 #06 Y:2025 | 06 | 2025 | Install adequate dryers on air lines to eliminate blowdown | $1,559 | $7,500 | |
| DL0254 #05 Y:2025 | 05 | 2025 | Install isolation transformer on adjustable frequency drive | $6,715 | $20,000 | |
| DL0254 #04 Y:2025 | 04 | 2025 | Insulate bare equipment | $3,650 | $4,699 | |
| DL0254 #03 Y:2025 | 03 | 2025 | Use heat pump for space conditioning | $1,746 | $7,000 | |
| DL0254 #02 Y:2025 | 02 | 2025 | Reduce space conditioning during non-working hours | $943 | - | |
| DL0248 #04 Y:2024 | 04 | 2024 | Use / purchase optimum sized compressor | $4,139 | $10,680 | |
| DL0248 #03 Y:2024 | 03 | 2024 | Insulate bare equipment | $5,964 | $373 | |
| DL0248 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,209 | $291 | |
| DL0247 #09 Y:2024 | 09 | 2024 | Utilize a less expensive cooling method | $116,551 | $1,000,000 | |
| DL0247 #08 Y:2024 | 08 | 2024 | Replace existing chiller with high efficiency model | $27,958 | $200,000 | |
| DL0247 #05 Y:2024 | 05 | 2024 | Turn off equipment when not in use | $399 | - | |
| DL0247 #04 Y:2024 | 04 | 2024 | Turn off steam / hot water lines leading to space heating units | $1,592 | - | |
| DL0247 #02 Y:2024 | 02 | 2024 | Utilize controls to operate equipment only when needed | $4,382 | - | |
| DL0246 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,359 | $16,560 | |
| DL0246 #04 Y:2024 | 04 | 2024 | Recycle air for heating, ventilation and air conditioning | $65,735 | $420,000 | |
| DL0246 #03 Y:2024 | 03 | 2024 | Recover waste heat from equipment | $8,062 | $21,900 | |
| DL0246 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $1,262 | $8,600 | |
| DL0246 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $41,655 | $181,095 |