Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0184 #09 Y:2020 Use continuous equipment which retains process heating conveyors within the heated chamber $240 $40
DL0184 #08 Y:2020 Insulate bare equipment $2,680 $152
DL0184 #07 Y:2020 Insulate bare equipment $800 $95
DL0184 #06 Y:2020 Insulate bare equipment $4,400 $4,750
DL0184 #05 Y:2020 Improve air circulation with destratification fans / other methods $9,500 $1,400
DL0184 #04 Y:2020 Recover waste heat from equipment $2,170 $4,250
DL0184 #03 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $41,700 $6,337
DL0184 #01 Y:2020 Turn off equipment when not in use $5,702 -
DL0174 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $15,220 $34,080
DL0174 #08 Y:2017 Use flow control valves on equipment to optimize water use $630 $2,000
DL0174 #07 Y:2017 Use or replace with energy efficient substitutes $10,500 $25,000
DL0174 #06 Y:2017 Minimize operation of equipment maintained in standby condition $10,800 -
DL0174 #05 Y:2017 Isolate steam lines to avoid heating air conditioned areas $5,100 $10,000
DL0174 #04 Y:2017 Use or replace with energy efficient substitutes $3,550 $8,000
DL0174 #03 Y:2017 Turn off equipment during breaks, reduce operating time $5,810 $6,000
DL0174 #02 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $10,710 $18,000
DL0174 #01 Y:2017 Turn off equipment during breaks, reduce operating time $3,170 $4,000
DL0170 #04 Y:2016 Use solar heat to make electricty $8,780 $47,412
DL0170 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,950 $9,830
DL0170 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $15,055 $40,740