Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

612

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0254 #08 Y:2025 Add/modify equipment to improve drying process $88,915 $400,000
DL0254 #07 Y:2025 Replace obsolete burners with more efficient ones $11,855 $58,000
DL0254 #06 Y:2025 Install adequate dryers on air lines to eliminate blowdown $1,559 $7,500
DL0254 #05 Y:2025 Install isolation transformer on adjustable frequency drive $6,715 $20,000
DL0254 #04 Y:2025 Insulate bare equipment $3,650 $4,699
DL0254 #03 Y:2025 Use heat pump for space conditioning $1,746 $7,000
DL0254 #02 Y:2025 Reduce space conditioning during non-working hours $943 -
DL0248 #04 Y:2024 Use / purchase optimum sized compressor $4,139 $10,680
DL0248 #03 Y:2024 Insulate bare equipment $5,964 $373
DL0248 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,209 $291
DL0247 #09 Y:2024 Utilize a less expensive cooling method $116,551 $1,000,000
DL0247 #08 Y:2024 Replace existing chiller with high efficiency model $27,958 $200,000
DL0247 #05 Y:2024 Turn off equipment when not in use $399 -
DL0247 #04 Y:2024 Turn off steam / hot water lines leading to space heating units $1,592 -
DL0247 #02 Y:2024 Utilize controls to operate equipment only when needed $4,382 -
DL0246 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $13,359 $16,560
DL0246 #04 Y:2024 Recycle air for heating, ventilation and air conditioning $65,735 $420,000
DL0246 #03 Y:2024 Recover waste heat from equipment $8,062 $21,900
DL0246 #02 Y:2024 Insulate bare equipment $1,262 $8,600
DL0246 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $41,655 $181,095