Assessment Year | 2025 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 20 |
Plant Area |
300,000
ft2
|
Annual Production | 265,000
ton
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,777 | 734,079 |
kWh
|
$0.069 |
Electricity Demand | $28,460 | 4,131 |
kW-mo/yr
|
$6.89 |
Electricity Fees | $9,608 | - |
|
- |
Natural Gas | $370,505 | 70,034 |
MMBtu
|
$5.29 |
Other Gas | $14,905 | 1 |
MMBtu
|
$14,905.00 |
TOTAL YEARLY COSTS | $474,255 | |||
RECOMMENDED SAVINGS* | $133,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,794 | $10,000 |
$11,366
164,724
kWh
|
$6,428
-
kW-mo/yr
|
- | |
02 | 2.7224: Reduce space conditioning during non-working hours | $943 | - |
$943
13,664
kWh
|
- | - | |
03 | 2.7234: Use heat pump for space conditioning | $1,746 | $7,000 |
$1,115
16,163
kWh
|
$631
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $3,650 | $4,699 | - | - |
$3,650
-
MMBtu
|
|
05 | 2.4145: Install isolation transformer on adjustable frequency drive | $6,715 | $20,000 |
$4,289
62,120
kWh
|
$2,426
-
kW-mo/yr
|
- | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,559 | $7,500 |
$996
14,438
kWh
|
$563
-
kW-mo/yr
|
- | |
07 | 2.1221: Replace obsolete burners with more efficient ones | $11,855 | $58,000 | - | - |
$11,855
-
MMBtu
|
|
08 | 4.114: Add/modify equipment to improve drying process | $88,915 | $400,000 | - | - |
$88,915
-
MMBtu
|
|
TOTAL RECOMMENDED | $133,177 | $507,199 |
$18,709
271,109
kWh
|
$10,048
-
kW-mo/yr
|
$104,420
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs