ITAC Assessment: DL0254
ITAC logo
ITAC Assessment: DL0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 300,000
ft2
Annual Production 265,000
ton
Production Hrs. Annual 2,200
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,777 734,079
kWh
Electricity Demand $28,460 4,131
kW-mo/yr
Electricity Fees $9,608 -
Natural Gas $370,505 70,034
MMBtu
Other Gas $14,905 1
MMBtu
TOTAL YEARLY COSTS $474,255
RECOMMENDED SAVINGS* $133,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,794 $10,000 $11,366
164,724
kWh
$6,428
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $943 - $943
13,664
kWh
- -
03 2.7234: Use heat pump for space conditioning $1,746 $7,000 $1,115
16,163
kWh
$631
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $3,650 $4,699 - - $3,650
-
MMBtu
05 2.4145: Install isolation transformer on adjustable frequency drive $6,715 $20,000 $4,289
62,120
kWh
$2,426
-
kW-mo/yr
-
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,559 $7,500 $996
14,438
kWh
$563
-
kW-mo/yr
-
07 2.1221: Replace obsolete burners with more efficient ones $11,855 $58,000 - - $11,855
-
MMBtu
08 4.114: Add/modify equipment to improve drying process $88,915 $400,000 - - $88,915
-
MMBtu
TOTAL RECOMMENDED $133,177 $507,199 $18,709
271,109
kWh
$10,048
-
kW-mo/yr
$104,420
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs