ITAC Assessment: OR0520
ITAC logo
ITAC Assessment: OR0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product fruit and candy
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 500
Plant Area 50,000
ft2
Annual Production 500,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,273,652 28,350,000
kWh
Electricity Demand $214,229 90,000
kW-mo/yr
Natural Gas $512,036 54,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.8112: Combine utility meters $33,600 $32,500 - - $33,600
02 2.329: $15,400 - $15,400
418,300
kWh
- -
03 2.7135: Install occupancy sensors $11,700 $31,650 $11,700
195,700
kWh
- -
04 2.7135: Install occupancy sensors $8,600 $17,550 $8,600
171,500
kWh
- -
05 2.2127: Flash condensate to produce lower pressure steam $4,800 $6,400 - $4,800
-
MMBtu
-
06 2.1224: Replace boiler $4,900 $5,250 - $4,900
-
MMBtu
-
07 2.2123: Insulate feedwater tank $3,400 $2,160 - $3,400
-
MMBtu
-
TOTAL RECOMMENDED $82,400 $95,510 $35,700
785,500
kWh
$13,100
-
MMBtu
$33,600
TOTAL IMPLEMENTED $82,400 $95,510 $35,700
785,500
kWh
$13,100
-
MMBtu
$33,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs