Assessment Year | 1998 |
---|---|
Principal Product | Synthetic Stucco Products |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 22 |
Plant Area |
22,000
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 3,850
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,402 | 572,098 |
kWh
|
$0.067 |
Electricity Demand | $6,261 | 2,368 |
kW-mo/yr
|
$2.64 |
Electricity Fees | $2,417 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,714 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,677 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,695 | $6,794 |
$2,067
37,808
kWh
|
$628
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $200 | $236 |
$143
2,638
kWh
|
$57
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $2,756 | $7,072 |
$2,002
36,635
kWh
|
$754
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $251 | $75 |
$251
4,689
kWh
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,554 | $60 |
$2,614
48,066
kWh
|
$940
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $342 | $212 |
$254
4,689
kWh
|
$88
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,126 | $620 |
$2,300
42,204
kWh
|
$826
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.1191: Change procedures / equipment / operating conditions | $1,203 | $30 | - | - | - |
$1,303
-
lb
|
- | $(-100.0) | |
09 | 4.231: Purchase equipment instead of leasing | $1,827 | $625 | - | - |
$(-11.0)
-
Tgal
|
- | $1,973 | $(-135.0) | |
10 | 4.821: Pay bills on time to avoid late fees | $760 | $60 | - | - | - | - | $760 | - | |
TOTAL RECOMMENDED | $16,714 | $15,784 |
$9,631
176,729
kWh
|
$3,293
-
kW-mo/yr
|
$(-11.0)
-
Tgal
|
$1,303
-
lb
|
$2,733 | $(-235.0) | ||
TOTAL IMPLEMENTED | $13,677 | $8,778 |
$7,310
134,232
kWh
|
$2,577
-
kW-mo/yr
|
$(-11.0)
-
Tgal
|
$1,303
-
lb
|
$2,733 | $(-235.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs