ITAC Assessment: IP0139
ITAC logo
ITAC Assessment: IP0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Burial Caskets
NAICS 339995: Burial Casket Manufacturing
SIC 3995: Burial Caskets
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 52,000
units
Production Hrs. Annual 5,668
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,703 2,383,920
kWh
Electricity Demand $55,793 9,060
kW-mo/yr
Electricity Fees $228 -
Natural Gas $17,052 2,078
MMBtu
TOTAL YEARLY COSTS $335,776
RECOMMENDED SAVINGS* $128,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $1,243 - $1,157
10,512
kWh
$86
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,551 $36 $4,551
41,299
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $84,001 $51,911 $75,112
681,593
kWh
$8,889
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $647 $1,350 $548
4,975
kWh
$99
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $37,750 $333,343 $37,750
342,556
kWh
-
TOTAL RECOMMENDED $128,192 $386,640 $119,118
1,080,935
kWh
$9,074
-
kW-mo/yr
TOTAL IMPLEMENTED $90,442 $53,297 $81,368
738,379
kWh
$9,074
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs