Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

784

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2402 #09 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $6,701 $64,088
UC2402 #08 Y:2024 Utilize controls to operate equipment only when needed $1,934 $155
UC2402 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $419 $1,300
UC2402 #06 Y:2024 Utilize controls to operate equipment only when needed $4,612 $30
UC2402 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $2,261 $150
UC2402 #04 Y:2024 Eliminate or reduce compressed air usage $2,943 $1,040
UC2402 #03 Y:2024 Install / repair insulation on steam lines $1,298 $3,327
UC2402 #02 Y:2024 Use battery storage for demand control $7,849 $31,027
UC2402 #01 Y:2024 Use solar heat to make electricty $17,049 $134,289
UC2317 #12 Y:2023 Change rate schedules or other changes in utility service $5,411 -
UC2317 #11 Y:2023 Use solar heat to make electricty $321,413 $2,701,940
UC2317 #10 Y:2023 Install timers and/or thermostats $6,903 $1,468
UC2317 #09 Y:2023 Adopt in-house material generation $30,659 $188,853
UC2317 #08 Y:2023 Recover waste heat from equipment $1,409 $34,609
UC2317 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $7,763 $17,190
UC2317 #06 Y:2023 Close holes and openings in building such as broken windows $714 $540
UC2317 #05 Y:2023 Utilize controls to operate equipment only when needed $5,240 $50
UC2317 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,584 $1,300
UC2317 #03 Y:2023 Install compressor air intakes in coolest locations $1,123 $428
UC2317 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $392 $75