765
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2317 #12 Y:2023 | 12 | 2023 | Change rate schedules or other changes in utility service | $5,411 | - | |
UC2317 #11 Y:2023 | 11 | 2023 | Use solar heat to make electricty | $321,413 | $2,701,940 | |
UC2317 #10 Y:2023 | 10 | 2023 | Install timers and/or thermostats | $6,903 | $1,468 | |
UC2317 #09 Y:2023 | 09 | 2023 | Adopt in-house material generation | $30,659 | $188,853 | |
UC2317 #08 Y:2023 | 08 | 2023 | Recover waste heat from equipment | $1,409 | $34,609 | |
UC2317 #07 Y:2023 | 07 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $7,763 | $17,190 | |
UC2317 #06 Y:2023 | 06 | 2023 | Close holes and openings in building such as broken windows | $714 | $540 | |
UC2317 #05 Y:2023 | 05 | 2023 | Utilize controls to operate equipment only when needed | $5,240 | $50 | |
UC2317 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,584 | $1,300 | |
UC2317 #03 Y:2023 | 03 | 2023 | Install compressor air intakes in coolest locations | $1,123 | $428 | |
UC2317 #02 Y:2023 | 02 | 2023 | Reduce the pressure of compressed air to the minimum required | $392 | $75 | |
UC2317 #01 Y:2023 | 01 | 2023 | Optimize plant power factor | $90,350 | $29,189 | |
UC2316 #10 Y:2023 | 10 | 2023 | Use solar heat to make electricty | $20,195 | $268,543 | |
UC2316 #09 Y:2023 | 09 | 2023 | Install wind powered electric generator | $1,380,736 | $10,992,131 | |
UC2316 #08 Y:2023 | 08 | 2023 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $22,194 | $134,412 | |
UC2316 #07 Y:2023 | 07 | 2023 | Replace boiler | $177,614 | $423,535 | |
UC2316 #06 Y:2023 | 06 | 2023 | Burn a less expensive grade of fuel | $153,910 | $207,578 | |
UC2316 #05 Y:2023 | 05 | 2023 | Reduce excessive boiler blowdown | $2,801 | $12,000 | |
UC2316 #04 Y:2023 | 04 | 2023 | Install turbulators | $13,337 | $10,920 | |
UC2316 #03 Y:2023 | 03 | 2023 | Recover and reuse waste material | $76,811 | $332,613 |