Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ophthalmic goods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0352 #12 Y:2019 Use optimum size and capacity equipment $518 $2,294
MI0352 #10 Y:2019 Use proper thickness of insulation on building envelope $603 $2,315
MI0352 #09 Y:2019 Install occupancy sensors $656 $319
MI0352 #07 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,851 $1,846
MI0352 #06 Y:2019 Change rate schedules or other changes in utility service $3,012 $100
MI0352 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $3,725 $2,284
MI0352 #04 Y:2019 Install vinyl strip / high speed / air curtain doors $6,201 $7,920
MI0352 #03 Y:2019 Use solar heat to heat water $7,116 $10,125
MI0352 #02 Y:2019 Turn off equipment when not in use $11,207 $3,600
MI0352 #01 Y:2019 Insulate glazing, walls, ceilings, and roofs $15,430 $10,964
MI0230 #15 Y:2012 Install occupancy sensors $2,794 $320
MI0230 #14 Y:2012 Utilize daylight whenever possible in lieu of artificial light $4,550 $40
MI0230 #12 Y:2012 Install partitions to reduce size of conditioned space $6,487 $2,848
MI0230 #10 Y:2012 Install / repair insulation on steam lines $7,962 $1,589
MI0230 #08 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $10,512 $1,040
MI0230 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $17,707 $1,660
MI0230 #05 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $45,101 $41,600
MI0230 #03 Y:2012 Insulate glazing, walls, ceilings, and roofs $88,716 $46,097
MI0230 #01 Y:2012 Lower temperature during the winter season and vice-versa $185,551 $480