Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,299

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0588 #08 Y:2024 Install occupancy sensors $38 $140
LE0588 #07 Y:2024 Replace obsolete burners with more efficient ones $175,084 $635,000
LE0588 #06 Y:2024 Re-use or recycle hot or cold process exhaust air $938 $2,500
LE0588 #05 Y:2024 Replace fossil fuel equipment with electrical equipment $25,169 $56,274
LE0588 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $13,600 $26,934
LE0588 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,412 $1,256
LE0588 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,235 $100
LE0588 #01 Y:2024 Pay utility bills on time $1,523 -
SU0565 #09 Y:2024 Recover waste heat from equipment $1,298 $6,264
SU0565 #08 Y:2024 Use or replace with energy efficient substitutes $566 $906
SU0565 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,157 $7,850
SU0565 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,849 $329
SU0565 #04 Y:2024 Use or replace with energy efficient substitutes $965 $54
SU0565 #03 Y:2024 Eliminate or reduce compressed air usage $1,877 -
SU0565 #02 Y:2024 Apply for tax-free status for energy purchases $14,793 -
SU0565 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $6,336 -
SU0563 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $26,793 $26,262
SU0563 #05 Y:2024 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,466 $500
SU0563 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,699 $2,100
SU0563 #01 Y:2024 Eliminate or reduce compressed air usage $6,490 -