ITAC Assessment: SU0589
ITAC logo
ITAC Assessment: SU0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Precision optics
NAICS 333310: Commercial and Service Industry Machinery Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 151,356
ft2
Annual Production 65,000
units
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $685,305 5,155,107
kWh
Electricity Demand $374,085 21,123
kW-mo/yr
Electricity Fees $22,539 -
Natural Gas $52,195 10,079
MMBtu
Other Gas $734 10,079
MMBtu
Waste Disposal Costs
Water Usage $20,000 2,931
Tgal
TOTAL YEARLY COSTS $1,154,858
RECOMMENDED SAVINGS* $307,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,704 - - $18,704
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $3,513 - $2,835
21,314
kWh
$678
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $37,179 - $37,179
279,538
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $4,120 $313 $2,394
18,000
kWh
$1,328
-
kW-mo/yr
$398
-
MMBtu
-
05 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $37,186 $3,500 $37,186
279,596
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $41,161 $16,667 $23,206
174,484
kWh
$9,298
-
kW-mo/yr
- $8,657
07 2.7135: Install occupancy sensors $2,093 $1,943 $2,093
15,739
kWh
- - -
08 2.6211: Conserve energy by efficient use of vending machines $1,631 $1,642 $1,631
12,264
kWh
- - -
09 2.4322: Use or replace with energy efficient substitutes $975 $1,642 $616
4,635
kWh
$132
-
kW-mo/yr
- $227
10 4.631: Install an uninteruptable power supply $160,000 $480,000 - - - $160,000
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,043 $3,573 - - $1,043
-
MMBtu
-
12 2.2511: Insulate bare equipment $50 $185 $57
430
kWh
- $(-7.6)
-
MMBtu
-
13 2.2122: Install / repair insulation on condensate lines $17 $68 $15
116
kWh
- $2
-
MMBtu
-
14 2.2511: Insulate bare equipment $69 $384 - - $69
-
MMBtu
-
TOTAL RECOMMENDED $307,742 $509,917 $107,213
806,115
kWh
$30,140
-
kW-mo/yr
$1,505
-
MMBtu
$168,884
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs