7,618
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0183 #05 Y:1999 | 05 | 1999 | Repair and eliminate steam leaks | $13,112 | $550 | |
| WV0183 #04 Y:1999 | 04 | 1999 | Install skylights | $1,074 | $3,450 | |
| WV0183 #03 Y:1999 | 03 | 1999 | Close holes and openings in building such as broken windows | $2,279 | $2,450 | |
| WV0183 #02 Y:1999 | 02 | 1999 | Repair or replace steam traps | $50,000 | $13,000 | |
| WV0183 #01 Y:1999 | 01 | 1999 | Reduce excess steam bleeding | $9,583 | $50,000 | |
| WV0182 #10 Y:1999 | 10 | 1999 | Replace existing equipment with more suitable substitutes | $20,000 | $7,000 | |
| WV0182 #09 Y:1999 | 09 | 1999 | Direct waste gasses to boiler combustion air | $119,000 | $250,000 | |
| WV0182 #08 Y:1999 | 08 | 1999 | Use filtration, centrifuging to remove contaminants | $56,000 | $69,950 | |
| WV0182 #07 Y:1999 | 07 | 1999 | Use cold waste water to cool chiller feed water | $7,785 | $12,000 | |
| WV0182 #06 Y:1999 | 06 | 1999 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $35,688 | $6,000 | |
| WV0182 #05 Y:1999 | 05 | 1999 | Install spectral reflectors / delamp | $1,009 | $1,458 | |
| WV0182 #04 Y:1999 | 04 | 1999 | Modify refrigeration system to operate at a lower pressure | $1,200 | $70 | |
| WV0182 #03 Y:1999 | 03 | 1999 | Utilize a less expensive cooling method | $5,450 | $1,870 | |
| WV0182 #02 Y:1999 | 02 | 1999 | Utilize energy-efficient belts and other improved mechanisms | $1,677 | $175 | |
| WV0182 #01 Y:1999 | 01 | 1999 | Reduce the pressure of compressed air to the minimum required | $5,539 | $60 | |
| WV0181 #10 Y:1999 | 10 | 1999 | Add equipment/ operators to reduce production bottleneck | $15,000 | $1,500 | |
| WV0181 #09 Y:1999 | 09 | 1999 | Install equipment (eg compactor) to reduce disposal costs | $5,209 | $11,000 | |
| WV0181 #08 Y:1999 | 08 | 1999 | Lease / purchase baler; sell cardboard to recycler | $1,824 | $350 | |
| WV0181 #07 Y:1999 | 07 | 1999 | Install equipment (eg compactor) to reduce disposal costs | $9,846 | $10,000 | |
| WV0181 #06 Y:1999 | 06 | 1999 | Utilize energy-efficient belts and other improved mechanisms | $950 | $200 |