Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,618

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0183 #05 Y:1999 Repair and eliminate steam leaks $13,112 $550
WV0183 #04 Y:1999 Install skylights $1,074 $3,450
WV0183 #03 Y:1999 Close holes and openings in building such as broken windows $2,279 $2,450
WV0183 #02 Y:1999 Repair or replace steam traps $50,000 $13,000
WV0183 #01 Y:1999 Reduce excess steam bleeding $9,583 $50,000
WV0182 #10 Y:1999 Replace existing equipment with more suitable substitutes $20,000 $7,000
WV0182 #09 Y:1999 Direct waste gasses to boiler combustion air $119,000 $250,000
WV0182 #08 Y:1999 Use filtration, centrifuging to remove contaminants $56,000 $69,950
WV0182 #07 Y:1999 Use cold waste water to cool chiller feed water $7,785 $12,000
WV0182 #06 Y:1999 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $35,688 $6,000
WV0182 #05 Y:1999 Install spectral reflectors / delamp $1,009 $1,458
WV0182 #04 Y:1999 Modify refrigeration system to operate at a lower pressure $1,200 $70
WV0182 #03 Y:1999 Utilize a less expensive cooling method $5,450 $1,870
WV0182 #02 Y:1999 Utilize energy-efficient belts and other improved mechanisms $1,677 $175
WV0182 #01 Y:1999 Reduce the pressure of compressed air to the minimum required $5,539 $60
WV0181 #10 Y:1999 Add equipment/ operators to reduce production bottleneck $15,000 $1,500
WV0181 #09 Y:1999 Install equipment (eg compactor) to reduce disposal costs $5,209 $11,000
WV0181 #08 Y:1999 Lease / purchase baler; sell cardboard to recycler $1,824 $350
WV0181 #07 Y:1999 Install equipment (eg compactor) to reduce disposal costs $9,846 $10,000
WV0181 #06 Y:1999 Utilize energy-efficient belts and other improved mechanisms $950 $200