ITAC Assessment: WV0147
ITAC logo
ITAC Assessment: WV0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Presses and hand blown glass
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 3,185
ton
Production Hrs. Annual 5,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,080 5,946,073
kWh
Electricity Demand $98,634 10,672
kW-mo/yr
Natural Gas $482,116 145,643
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $364,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2514: Cover open tanks $3,101 $2,092 - - $3,101
-
MMBtu
- - - -
02 2.2514: Cover open tanks $4,324 $892 - - $4,324
-
MMBtu
- - - -
03 2.6218: Turn off equipment when not in use $785 - $785
27,257
kWh
- - - - - -
04 2.4221: Install compressor air intakes in coolest locations $350 $205 $350
12,896
kWh
- - - - - -
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $26,380 $115,500 - $11,484
-
kW-mo/yr
$16,788
-
MMBtu
- - $(-1,892.0) -
06 2.6212: Turn off equipment during breaks, reduce operating time $190 - - - $190
-
MMBtu
- - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $4,290 - - - $4,290
-
MMBtu
- - - -
08 2.8113: Purchase gas directly from a contract gas supplier $45,149 $100 - - - - - - $45,149
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,361 $48 - - - - $1,361
-
lb
- -
10 3.4111: Use closed cycle process to minimize waste water production $783 $850 - - - $783
-
gal
- - -
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,657 $11,000 - - - - $3,657
-
lb
- -
12 4.432: Cross-train personnel to avoid lost time $274,060 - - - - - - - $274,060
13 4.821: Pay bills on time to avoid late fees - - - - - - - - -
TOTAL RECOMMENDED $364,430 $130,687 $1,135
40,153
kWh
$11,484
-
kW-mo/yr
$28,693
-
MMBtu
$783
-
gal
$5,018
-
lb
$(-1,892.0) $319,209
TOTAL IMPLEMENTED $11,733 $1,790 $785
27,257
kWh
- $8,804
-
MMBtu
$783
-
gal
$1,361
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs