ITAC Assessment: UD0615
ITAC logo
ITAC Assessment: UD0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Adhesives and Sealants
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 235,830
ft2
Annual Production 246,925,344
lb
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,623 15,679,745
kWh
Electricity Demand $349,515 30,552
kW-mo/yr
Natural Gas $316,132 77,023
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,423 $42,285 $9,080
302,664
kWh
$11,737
-
kW-mo/yr
- - - $606
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,160 - - $17,160
-
kW-mo/yr
- - - -
03 3.2176: Increase use of automation $8,687 $2,415 - - $3,395
-
MMBtu
- $5,292 -
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,360 $500 - - $8,360
-
MMBtu
- - -
05 3.4111: Use closed cycle process to minimize waste water production $2,615 $12,800 $(-1,735.0)
(-34,690)
kWh
- - $4,350
-
Tgal
- -
06 2.2437: Recover waste heat from equipment $5,831 $8,500 $681
32,412
kWh
$508
-
kW-mo/yr
$4,642
-
MMBtu
- - -
TOTAL RECOMMENDED $64,076 $66,500 $8,026
300,386
kWh
$29,405
-
kW-mo/yr
$16,397
-
MMBtu
$4,350
-
Tgal
$5,292 $606
TOTAL IMPLEMENTED $44,414 $50,785 $9,761
335,076
kWh
$29,405
-
kW-mo/yr
$4,642
-
MMBtu
- - $606
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs