ITAC Assessment: OR0607
ITAC logo
ITAC Assessment: OR0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 1,220,000
ft2
Annual Production 24,000,000
units
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,395 3,799,680
kWh
Electricity Demand $130,114 16,808
kW-mo/yr
Electricity Fees $26,732 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $52,535 $27,268 $41,582
865,392
kWh
$10,953
-
kW-mo/yr
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,626 $5,352 $4,626
96,286
kWh
- -
03 2.3212: Optimize plant power factor $3,603 $9,150 - - $3,603
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,983 $7,504 $8,983
169,173
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,021 $5,130 $2,021
42,059
kWh
- -
TOTAL RECOMMENDED $71,768 $54,404 $57,212
1,172,910
kWh
$10,953
-
kW-mo/yr
$3,603
TOTAL IMPLEMENTED $11,004 $12,634 $11,004
211,232
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs