Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,661

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0700 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $496 $600
WV0700 #08 Y:2026 Eliminate or reduce compressed air usage $797 $1,958
WV0700 #07 Y:2026 Upgrade controls on compressors $1,012 $3,260
WV0700 #06 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,452 $3,984
WV0700 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,297 $700
WV0700 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,922 $441
WV0700 #03 Y:2026 Install occupancy sensors $6,781 $4,160
WV0700 #02 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,816 $7,000
WV0700 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $22,299 $86,100
WV0699 #10 Y:2026 Eliminate or reduce compressed air usage $830 $962
WV0699 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $1,006 $200
WV0699 #08 Y:2026 Install set-back timers $1,060 $1,250
WV0699 #07 Y:2026 Eliminate or reduce compressed air usage $1,117 $221
WV0699 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,298 $5,700
WV0699 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,454 $1,704
WV0699 #04 Y:2026 Insulate bare equipment $3,455 $1,276
WV0699 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,173 $756
WV0699 #02 Y:2026 Upgrade controls on compressors $5,185 $3,635
WV0699 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,816 $25,580
WV0698 #13 Y:2026 Install occupancy sensors $314 $990