ITAC Assessment: WV0686
ITAC logo
ITAC Assessment: WV0686
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product PCBA’s & Electro-Mechanical Assemblies
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 70,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,083 1,581,876
kWh
Electricity Demand $21,933 4,395
kW-mo/yr
Natural Gas $12,218 1,772
MMBtu
TOTAL YEARLY COSTS $151,234
RECOMMENDED SAVINGS* $13,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,920 $1,550 $4,286
57,907
kWh
$634
-
kW-mo/yr
-
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $2,427 $11,850 $(-682.0)
(-9,211)
kWh
$(-100.0)
-
kW-mo/yr
$3,209
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,393 $9,261 $181
2,455
kWh
$25
-
kW-mo/yr
$2,187
-
MMBtu
04 2.6232: Install set-back timers $1,875 $1,135 $1,254
16,949
kWh
$110
-
kW-mo/yr
$511
-
MMBtu
05 2.2511: Insulate bare equipment $964 $412 $849
10,624
kWh
$115
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $814 $894 $709
9,585
kWh
$105
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $247 $108 $217
2,938
kWh
$30
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,640 $25,210 $6,814
91,247
kWh
$919
-
kW-mo/yr
$5,907
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs