ITAC Assessment: NC0201
ITAC logo
ITAC Assessment: NC0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fabric for shirts and home fashion
NAICS
n/a
SIC 2210:
Sales Range $100
M
to 500
M
# of Employees 680
Plant Area 785,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 8,448
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,884,815 122,808,912
kWh
Electricity Demand $2,744,407 180,881
kW-mo/yr
Electricity Fees $218,049 -
Natural Gas $505,889 120,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,527 $2,233 $828
35,170
kWh
$699
-
kW-mo/yr
-
02 2.3132: Recharge batteries on during off-peak demand periods $824 - - $824
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $56,972 $10,000 $21,482
907,972
kWh
$35,490
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $24,065 $105,600 $13,029
554,513
kWh
$11,036
-
kW-mo/yr
-
05 3.4114: Replace city water with recycled water via cooling tower $5,960 $2,500 - - $5,960
-
Tgal
TOTAL RECOMMENDED $89,348 $120,333 $35,339
1,497,655
kWh
$48,049
-
kW-mo/yr
$5,960
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs