4,298
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0512 #03 Y:2005 | 03 | 2005 | Use evaporation to concentrate material | $24,691 | $12,000 | |
| WI0512 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $29,679 | $72,610 | |
| WI0512 #01 Y:2005 | 01 | 2005 | Re-arrange equipment layout to reduce labor costs | $554 | $21,500 | |
| WI0511 #09 Y:2005 | 09 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $263 | - | |
| WI0511 #08 Y:2005 | 08 | 2005 | Install occupancy sensors | $283 | $150 | |
| WI0511 #07 Y:2005 | 07 | 2005 | Install compressor air intakes in coolest locations | $290 | $640 | |
| WI0511 #06 Y:2005 | 06 | 2005 | Reduce the pressure of compressed air to the minimum required | $446 | - | |
| WI0511 #05 Y:2005 | 05 | 2005 | Use synthetic lubricant | $2,149 | - | |
| WI0511 #04 Y:2005 | 04 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,712 | - | |
| WI0511 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,167 | $8,820 | |
| WI0511 #02 Y:2005 | 02 | 2005 | Install timers and/or thermostats | $8,256 | $850 | |
| WI0511 #01 Y:2005 | 01 | 2005 | Automate payroll system | $10,890 | $6,000 | |
| WI0510 #08 Y:2005 | 08 | 2005 | Install set-back timers | $340 | $100 | |
| WI0510 #07 Y:2005 | 07 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $443 | $438 | |
| WI0510 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $1,135 | $640 | |
| WI0510 #05 Y:2005 | 05 | 2005 | Insulate glazing, walls, ceilings, and roofs | $32,657 | $3,352 | |
| WI0510 #04 Y:2005 | 04 | 2005 | Recover waste heat from equipment | $4,554 | $1,000 | |
| WI0510 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $5,944 | $23,000 | |
| WI0510 #02 Y:2005 | 02 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $8,865 | $2,000 | |
| WI0510 #01 Y:2005 | 01 | 2005 | Install timers and/or thermostats | $12,014 | - |