Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,022

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0164 #05 Y:2019 Use radiant heater for spot heating $245 $540
UU0164 #04 Y:2019 Improve air circulation with destratification fans / other methods $750 $750
UU0164 #03 Y:2019 Install outside air damper / economizer on hvac unit $865 $2,038
UU0164 #02 Y:2019 Turn off equipment when not in use $1,660 $500
UU0164 #01 Y:2019 Lower temperature during the winter season and vice-versa $4,252 $2,000
UU0163 #07 Y:2019 Adopt in-house material generation $10,477 $5,000
UU0163 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,414 $15,055
UU0163 #05 Y:2019 Lower temperature during the winter season and vice-versa $4,576 $2,000
UU0163 #04 Y:2019 Optimize plant power factor $4,707 $8,012
UU0163 #03 Y:2019 Adopt in-house material generation $11,324 $5,000
UU0163 #02 Y:2019 Change rate schedules or other changes in utility service $29,850 $1,200
UU0163 #01 Y:2019 Use existing dam to generate electricity $38,699 $100,000
UU0162 #04 Y:2019 Modify refrigeration system to operate at a lower pressure $328 $1,141
UU0162 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $4,096 $5,759
UU0162 #02 Y:2019 Upgrade obsolete equipment $5,390 $7,024
UU0162 #01 Y:2019 Reduce fluid flow rates $8,259 $17,871
UU0161 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $1,780 $6,880
UU0161 #05 Y:2019 Isolate hot or cold equipment $2,460 $9,000
UU0161 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $5,370 $5,370
UU0161 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $8,315 $7,880