Assessment Year | 2025 |
---|---|
Principal Product | Oatbase |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2023: Dry, Condensed, and Evaporated Dairy Products |
Sales Range | $100 M to 500M |
# of Employees | 26 |
Plant Area |
14,000
ft2
|
Annual Production | 15,850
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $118,850 | 3,163,200 |
kWh
|
$0.038 | |
Electricity Demand | $165,170 | 12,600 |
kW-mo/yr
|
$13.11 | |
Natural Gas | $302,790 | 37,474 |
MMBtu
|
$8.08 | |
Waste Disposal Costs | |||||
Water Usage | $110,340 | 35,346 |
Tgal
|
$3.12 | |
TOTAL YEARLY COSTS | $697,150 | ||||
RECOMMENDED SAVINGS* | $278,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $92,200 | $14,000 | - | - | - | - | - | $92,200 | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $119,920 | $620,000 |
$(-19,170.0)
(-518,000)
kWh
|
$(-17,430.0)
-
kW-mo/yr
|
$(-13,200.0) |
$169,720
-
MMBtu
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $5,400 | $15,580 | - | - | - |
$5,400
-
MMBtu
|
- | - | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $8,900 | $4,720 | - | - | - |
$11,720
-
MMBtu
|
$(-2,820.0)
-
Tgal
|
- | |
05 | 2.2511: Insulate bare equipment | $1,050 | $2,860 | - | - | - |
$1,050
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,760 | $1,400 |
$1,760
47,500
kWh
|
- | - | - | - | - | |
07 | 2.9114: Use solar heat to make electricty | $49,660 | $460,010 |
$40,980
1,107,644
kWh
|
$8,680
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $278,890 | $1,118,570 |
$23,570
637,144
kWh
|
$(-8,750.0)
-
kW-mo/yr
|
$(-13,200.0) |
$187,890
-
MMBtu
|
$(-2,820.0)
-
Tgal
|
$92,200 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs