ITAC Assessment: UU0279
ITAC logo
ITAC Assessment: UU0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Oatbase
NAICS 311511: Fluid Milk Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $100
M
to 500
M
# of Employees 26
Plant Area 14,000
ft2
Annual Production 15,850
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,850 3,163,200
kWh
Electricity Demand $165,170 12,600
kW-mo/yr
Natural Gas $302,790 37,474
MMBtu
Waste Disposal Costs
Water Usage $110,340 35,346
Tgal
TOTAL YEARLY COSTS $697,150
RECOMMENDED SAVINGS* $278,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $92,200 $14,000 - - - - - $92,200
02 2.1321: Replace fossil fuel equipment with electrical equipment $119,920 $620,000 $(-19,170.0)
(-518,000)
kWh
$(-17,430.0)
-
kW-mo/yr
$(-13,200.0) $169,720
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $5,400 $15,580 - - - $5,400
-
MMBtu
- -
04 2.6121: Reduce hot water temperature to the minimum required $8,900 $4,720 - - - $11,720
-
MMBtu
$(-2,820.0)
-
Tgal
-
05 2.2511: Insulate bare equipment $1,050 $2,860 - - - $1,050
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,400 $1,760
47,500
kWh
- - - - -
07 2.9114: Use solar heat to make electricty $49,660 $460,010 $40,980
1,107,644
kWh
$8,680
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $278,890 $1,118,570 $23,570
637,144
kWh
$(-8,750.0)
-
kW-mo/yr
$(-13,200.0) $187,890
-
MMBtu
$(-2,820.0)
-
Tgal
$92,200
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs