ITAC Assessment: ND0271
ITAC logo
ITAC Assessment: ND0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Welded Steel Tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 120,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,114 3,345,838
kWh
Electricity Demand $135,178 11,181
kW-mo/yr
Natural Gas $110,846 28,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,984 $718 $640
33,705
kWh
$1,344
-
kW-mo/yr
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $462 $200 $462
7,620
kWh
- - - -
03 2.7135: Install occupancy sensors $118 $200 $118
2,052
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,804 $420 $4,804
80,305
kWh
- - - -
05 2.7444: Close holes and openings in building such as broken windows $327 $124 - - $327
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $140 $155 - - $140
-
MMBtu
- -
07 2.4133: Use most efficient type of electric motors $591 $463 $188
9,672
kWh
$403
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $506 $100 $506
8,499
kWh
- - - -
09 3.1121: Use more efficient adhesive applicators $381 $360 - - - - $381
-
lb
10 3.8132: Use less toxic and volatile solvent substitutes $109 - - - - $109
-
gal
-
TOTAL RECOMMENDED $9,422 $2,740 $6,718
141,853
kWh
$1,747
-
kW-mo/yr
$467
-
MMBtu
$109
-
gal
$381
-
lb
TOTAL IMPLEMENTED $8,549 $2,285 $6,094
131,302
kWh
$1,747
-
kW-mo/yr
$327
-
MMBtu
- $381
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs