Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,335

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2431 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $12,842 $7,207
UL2410 #04 Y:2024 Lower temperature during the winter season and vice-versa $6,357 $1,200
UL2410 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,202 $4,083
UL2410 #02 Y:2024 Use solar heat to make electricty $52,875 $349,289
UL2410 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $12,828 $3,060
UL2409 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $11,680 $5,800
UL2409 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,092 $975
UL2409 #03 Y:2024 Use solar heat to make electricty $52,606 $886,307
UL2409 #02 Y:2024 Use outside cold water source as a supply of cooling water $8,858 $43,234
UL2409 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,073 $2,880
UL2408 #03 Y:2024 Recover waste heat from equipment $40,749 $39,000
UL2408 #02 Y:2024 Use solar heat to make electricty $319,482 $2,990,386
UL2408 #01 Y:2024 Use outside cold water source as a supply of cooling water $77,905 $42,617
UL2407 #07 Y:2024 Improve air circulation with destratification fans / other methods $4,307 $10,000
UL2407 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $3,343 -
UL2407 #05 Y:2024 Use outside cold water source as a supply of cooling water $41,469 $69,175
UL2407 #04 Y:2024 Use solar heat to make electricty $77,264 $788,082
UL2407 #03 Y:2024 Install occupancy sensors $184 $342
UL2407 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,908 $5,457
UL2407 #01 Y:2024 Optimize plant power factor $34,496 $23,699