ITAC Assessment: UL2411
ITAC logo
ITAC Assessment: UL2411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fireproof Logs
NAICS 327390: Other Concrete Product Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 144,530
ft2
Annual Production 173,037
units
Production Hrs. Annual 2,040
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,881 1,737,740
kWh
Electricity Demand $221,566 11,274
kW-mo/yr
Electricity Fees $37,948 -
Natural Gas $138,938 24,203
MMBtu
TOTAL YEARLY COSTS $467,333
RECOMMENDED SAVINGS* $123,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $76,606 $698,579 $40,986
1,033,991
kWh
$35,620
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $746 $2,700 $160
4,035
kWh
- $586
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,717 $1,995 $1,717
43,352
kWh
- -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,053 $13,653 - - $4,053
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,372 $5,000 - $5,372
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $35,308 $50,000 - - $35,308
-
MMBtu
TOTAL RECOMMENDED $123,802 $771,927 $42,863
1,081,378
kWh
$40,992
-
kW-mo/yr
$39,947
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs