ITAC Assessment: MS0466
ITAC logo
ITAC Assessment: MS0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Engine Components
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 85
Plant Area 230,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 4,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,996 13,197,643
kWh
Electricity Demand $238,908 36,881
kW-mo/yr
Electricity Fees $2,838 -
Natural Gas $107,906 8,927
MMBtu
Waste Disposal Costs
Water Usage $8,505 1,189
Tgal
Water Disposal $8,225 1,189
Tgal
TOTAL YEARLY COSTS $1,100,378
RECOMMENDED SAVINGS* $152,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $41,807 $88,391 - $41,807
-
kW-mo/yr
- -
02 2.8114: Change rate schedules or other changes in utility service $44,517 - - - $44,517 -
03 2.8112: Combine utility meters $300 - - - - $300
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,210 $2,244 $4,210
75,719
kWh
- - -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $42,861 $712 $42,861
783,282
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,101 $93,000 $19,101
343,538
kWh
- - -
TOTAL RECOMMENDED $152,796 $184,347 $66,172
1,202,539
kWh
$41,807
-
kW-mo/yr
$44,517 $300
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs