ITAC Assessment: UL2409
ITAC logo
ITAC Assessment: UL2409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Window Liners for Automotive
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area 130,000
ft2
Annual Production 34,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,654 6,757,908
kWh
Electricity Demand $112,338 15,652
kW-mo/yr
Electricity Fees $195,189 -
Natural Gas $34,542 15,933
MMBtu
TOTAL YEARLY COSTS $694,723
RECOMMENDED SAVINGS* $80,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,073 $2,880 $6,073
116,794
kWh
-
02 2.2692: Use outside cold water source as a supply of cooling water $8,858 $43,234 $7,005
134,238
kWh
$1,853
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $52,606 $886,307 $41,939
803,668
kWh
$10,668
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,092 $975 $1,092
20,924
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,680 $5,800 $9,153
183,057
kWh
$2,528
-
kW-mo/yr
TOTAL RECOMMENDED $80,310 $939,196 $65,261
1,258,681
kWh
$15,048
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs