Assessment Year | 2000 |
---|---|
Principal Product | flavoring extracts and syrups |
NAICS |
n/a
|
SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
65,000
ft2
|
Annual Production | 52,000,000
lb
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,003 | 5,470,692 |
kWh
|
$0.022 |
Electricity Demand | $121,974 | 8,700 |
kW-mo/yr
|
$14.02 |
Natural Gas | $199,088 | 54,671 |
MMBtu
|
$3.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $461,644 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.322: Eliminate old stock and modify inventory control | $330,000 | - | - | - | - | - |
$330,000
-
lb
|
- | - | - | - | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $96,096 | $106,000 | - | - | - | - | - | $96,096 | - | - | - | |
03 | 4.512: Condense operation into one building | $14,451 | $5,000 | - | - | - | - | - | $11,781 | $375 | $2,295 | - | |
04 | 3.1192: Reduce scrap production | $11,016 | $20,400 | - | - | - | - | - | - | - | - | $11,016 | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $8,851 | $2,000 | - | - |
$5,511
-
MMBtu
|
$2,678
-
Tgal
|
- | - | - | $662 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,230 | $846 |
$520
19,930
kWh
|
$555
-
kW-mo/yr
|
- | - | - | - | $155 | - | - | |
TOTAL RECOMMENDED | $461,644 | $134,246 |
$520
19,930
kWh
|
$555
-
kW-mo/yr
|
$5,511
-
MMBtu
|
$2,678
-
Tgal
|
$330,000
-
lb
|
$107,877 | $530 | $2,957 | $11,016 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs