| Assessment Year | 2000 |
|---|---|
| Principal Product | flavoring extracts and syrups |
| NAICS |
n/a
|
| SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
65,000
ft2
|
| Annual Production | 52,000,000
lb
|
| Production Hrs. Annual | 6,732
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $118,003 | 5,470,692 |
kWh
|
$0.022 |
| Electricity Demand | $121,974 | 8,700 |
kW-mo/yr
|
$14.02 |
| Natural Gas | $199,088 | 54,671 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $461,644 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.322: Eliminate old stock and modify inventory control | $330,000 | - | - | - | - | - |
$330,000
-
lb
|
- | - | - | - | |
| 02 | 4.111: Add equipment/ operators to reduce production bottleneck | $96,096 | $106,000 | - | - | - | - | - | $96,096 | - | - | - | |
| 03 | 4.512: Condense operation into one building | $14,451 | $5,000 | - | - | - | - | - | $11,781 | $375 | $2,295 | - | |
| 04 | 3.1192: Reduce scrap production | $11,016 | $20,400 | - | - | - | - | - | - | - | - | $11,016 | |
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $8,851 | $2,000 | - | - |
$5,511
-
MMBtu
|
$2,678
-
Tgal
|
- | - | - | $662 | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,230 | $846 |
$520
19,930
kWh
|
$555
-
kW-mo/yr
|
- | - | - | - | $155 | - | - | |
| TOTAL RECOMMENDED | $461,644 | $134,246 |
$520
19,930
kWh
|
$555
-
kW-mo/yr
|
$5,511
-
MMBtu
|
$2,678
-
Tgal
|
$330,000
-
lb
|
$107,877 | $530 | $2,957 | $11,016 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs