ITAC Assessment: UD0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product flavoring extracts and syrups
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 65,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 6,732
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,003 5,470,692
kWh
Electricity Demand $121,974 8,700
kW-mo/yr
Natural Gas $199,088 54,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $461,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.322: Eliminate old stock and modify inventory control $330,000 - - - - - $330,000
-
lb
- - - -
02 4.111: Add equipment/ operators to reduce production bottleneck $96,096 $106,000 - - - - - $96,096 - - -
03 4.512: Condense operation into one building $14,451 $5,000 - - - - - $11,781 $375 $2,295 -
04 3.1192: Reduce scrap production $11,016 $20,400 - - - - - - - - $11,016
05 2.2449: Recover heat from exhausted steam, hot air or hot water $8,851 $2,000 - - $5,511
-
MMBtu
$2,678
-
Tgal
- - - $662 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $846 $520
19,930
kWh
$555
-
kW-mo/yr
- - - - $155 - -
TOTAL RECOMMENDED $461,644 $134,246 $520
19,930
kWh
$555
-
kW-mo/yr
$5,511
-
MMBtu
$2,678
-
Tgal
$330,000
-
lb
$107,877 $530 $2,957 $11,016
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs