ITAC Assessment: AT0076
ITAC logo
ITAC Assessment: AT0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WOOD VENEERS
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 50,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,562 2,012,896
kWh
Wood $86,664 186,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.2136: Install / repair insulation on steam lines $395 $1,500 - $395
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,483 - $1,483
24,033
kWh
-
03 2.4133: Use most efficient type of electric motors $624 $722 $624
9,965
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $477 $477 $477
7,620
kWh
-
05 2.4312: Improve lubrication practices $608 - $608
9,965
kWh
-
06 2.2437: Recover waste heat from equipment $684 $300 $684
10,551
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $91 $100 $91
1,465
kWh
-
TOTAL RECOMMENDED $4,362 $3,099 $3,967
63,599
kWh
$395
-
MMBtu
TOTAL IMPLEMENTED $3,678 $2,799 $3,283
53,048
kWh
$395
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs