Assessment Year | 1994 |
---|---|
Principal Product | plastic injection molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 54 |
Plant Area |
40,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $164,883 | 3,143,611 |
kWh
|
$0.052 |
Natural Gas | $11,439 | 1,981 |
MMBtu
|
$5.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,641 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $763 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $513 | $100 |
$633
12,016
kWh
|
$(-120.0)
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $250 | $300 |
$309
5,862
kWh
|
$(-59.0)
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $1,464 | $2,500 |
$361
8,499
kWh
|
$1,103
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,114 | $2,770 |
$4,375
92,321
kWh
|
$(-261.0)
-
MMBtu
|
|
05 | 2.7131: Add area lighting switches | $300 | $50 |
$374
7,620
kWh
|
$(-74.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $6,641 | $5,720 |
$6,052
126,318
kWh
|
$589
-
MMBtu
|
||
TOTAL IMPLEMENTED | $763 | $400 |
$942
17,878
kWh
|
$(-179.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs