ITAC Assessment: OR0055
ITAC logo
ITAC Assessment: OR0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CLADWOOD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area
n/a
Annual Production 241,235
ton
Production Hrs. Annual 6,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,856 6,031,067
kWh
Natural Gas $234,481 107,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $1,145 $443 - $1,145
-
MMBtu
02 2.2511: Insulate bare equipment $1,169 $553 - $1,169
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $1,773 $1,200 - $1,773
-
MMBtu
04 2.4133: Use most efficient type of electric motors $439 $425 $439
10,551
kWh
-
05 2.2437: Recover waste heat from equipment $4,067 $947 $810
19,343
kWh
$3,257
-
MMBtu
06 2.3212: Optimize plant power factor $3,950 $8,400 $3,950
-
kWh
-
07 2.1213: Direct warmest air to combustion intake $333 $1,000 - $333
-
MMBtu
TOTAL RECOMMENDED $12,876 $12,968 $5,199
29,894
kWh
$7,677
-
MMBtu
TOTAL IMPLEMENTED $10,770 $10,768 $5,199
29,894
kWh
$5,571
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs