Assessment Year | 2012 |
---|---|
Principal Product | Circuit board laminaiton |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
60,000
ft2
|
Annual Production | 2,628
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $568,764 | 7,271,424 |
kWh
|
$0.078 |
Electricity Demand | $192,578 | 17,734 |
kW-mo/yr
|
$10.86 |
Electricity Fees | $10,250 | - |
|
- |
Fuel Oil #4 | $177,328 | 7,771 |
MMBtu
|
$22.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,396 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $37,819 | $31,800 |
$31,772
406,289
kWh
|
$6,047
-
kW-mo/yr
|
|
02 | 2.7314: Reduce ventilation air | $22,269 | $9,650 |
$18,218
232,970
kWh
|
$4,051
-
kW-mo/yr
|
|
03 | 2.6218: Turn off equipment when not in use | $4,815 | $4,000 |
$4,815
61,568
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $3,781 | - |
$3,781
48,355
kWh
|
- | |
05 | 2.2612: Use cooling tower water instead of refrigeration | $2,762 | $5,000 |
$2,762
35,322
kWh
|
- | |
TOTAL RECOMMENDED | $71,446 | $50,450 |
$61,348
784,504
kWh
|
$10,098
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $45,396 | $40,800 |
$39,349
503,179
kWh
|
$6,047
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs