ITAC Assessment: MAS028
ITAC logo
ITAC Assessment: MAS028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Circuit board laminaiton
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 60,000
ft2
Annual Production 2,628
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $568,764 7,271,424
kWh
Electricity Demand $192,578 17,734
kW-mo/yr
Electricity Fees $10,250 -
Fuel Oil #4 $177,328 7,771
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $37,819 $31,800 $31,772
406,289
kWh
$6,047
-
kW-mo/yr
02 2.7314: Reduce ventilation air $22,269 $9,650 $18,218
232,970
kWh
$4,051
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $4,815 $4,000 $4,815
61,568
kWh
-
04 2.2437: Recover waste heat from equipment $3,781 - $3,781
48,355
kWh
-
05 2.2612: Use cooling tower water instead of refrigeration $2,762 $5,000 $2,762
35,322
kWh
-
TOTAL RECOMMENDED $71,446 $50,450 $61,348
784,504
kWh
$10,098
-
kW-mo/yr
TOTAL IMPLEMENTED $45,396 $40,800 $39,349
503,179
kWh
$6,047
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs