| Assessment Year | 2017 |
|---|---|
| Principal Product | Development and Testing of Motorcycles and Components |
| NAICS | 541380: Testing Laboratories |
| SIC | 8734: Testing Laboratories |
| Sales Range | less than $500 k |
| # of Employees | 760 |
| Plant Area |
400,000
ft2
|
| Annual Production | 1
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $599,546 | 9,656,337 |
kWh
|
$0.062 | |
| Electricity Demand | $325,689 | 24,091 |
kW-mo/yr
|
$13.52 | |
| Electricity Fees | $21,588 | - |
|
- | |
| Natural Gas | $110,168 | 26,655 |
MMBtu
|
$4.13 | |
| Waste Disposal Costs | |||||
| Water Usage | $66,743 | 5,690 |
Tgal
|
$11.73 | |
| TOTAL YEARLY COSTS | $1,123,734 | ||||
| RECOMMENDED SAVINGS* | $120,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $18,173 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3112: Store heated/ cooled water for use during peak demand periods | $64,540 | $93,226 | - |
$46,247
-
kW-mo/yr
|
$18,293 | - | |
| 02 | 2.3212: Optimize plant power factor | $15,927 | $33,500 | - |
$15,927
-
kW-mo/yr
|
- | - | |
| 03 | 2.6241: Reduce temperature of process equipment when on standby | $14,165 | - | - | - | - |
$14,165
-
MMBtu
|
|
| 04 | 2.2437: Recover waste heat from equipment | $11,736 | $45,000 |
$1,317
21,216
kWh
|
- | - |
$10,419
-
MMBtu
|
|
| 05 | 2.6218: Turn off equipment when not in use | $4,008 | - |
$1,737
27,975
kWh
|
$2,271
-
kW-mo/yr
|
- | - | |
| 06 | 2.4314: Use synthetic lubricant | $7,607 | $650 |
$5,295
85,283
kWh
|
$2,312
-
kW-mo/yr
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $2,589 | $554 |
$1,386
22,320
kWh
|
$1,203
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $120,572 | $172,930 |
$9,735
156,794
kWh
|
$67,960
-
kW-mo/yr
|
$18,293 |
$24,584
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,173 | - |
$1,737
27,975
kWh
|
$2,271
-
kW-mo/yr
|
- |
$14,165
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs