ITAC Assessment: WM0104
ITAC logo
ITAC Assessment: WM0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Development and Testing of Motorcycles and Components
NAICS 541380: Testing Laboratories
SIC 8734: Testing Laboratories
Sales Range less than $500
k
# of Employees 760
Plant Area 400,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $599,546 9,656,337
kWh
Electricity Demand $325,689 24,091
kW-mo/yr
Electricity Fees $21,588 -
Natural Gas $110,168 26,655
MMBtu
Waste Disposal Costs
Water Usage $66,743 5,690
Tgal
TOTAL YEARLY COSTS $1,123,734
RECOMMENDED SAVINGS* $120,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $64,540 $93,226 - $46,247
-
kW-mo/yr
$18,293 -
02 2.3212: Optimize plant power factor $15,927 $33,500 - $15,927
-
kW-mo/yr
- -
03 2.6241: Reduce temperature of process equipment when on standby $14,165 - - - - $14,165
-
MMBtu
04 2.2437: Recover waste heat from equipment $11,736 $45,000 $1,317
21,216
kWh
- - $10,419
-
MMBtu
05 2.6218: Turn off equipment when not in use $4,008 - $1,737
27,975
kWh
$2,271
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $7,607 $650 $5,295
85,283
kWh
$2,312
-
kW-mo/yr
- -
07 2.7111: Reduce illumination to minimum necessary levels $2,589 $554 $1,386
22,320
kWh
$1,203
-
kW-mo/yr
- -
TOTAL RECOMMENDED $120,572 $172,930 $9,735
156,794
kWh
$67,960
-
kW-mo/yr
$18,293 $24,584
-
MMBtu
TOTAL IMPLEMENTED $18,173 - $1,737
27,975
kWh
$2,271
-
kW-mo/yr
- $14,165
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs